X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554191904000

Well Details

Well ID: 0554191904000
Loading map...
Location: 00/04-19-055-19W4/0
Location Alias: 00/04-19-55-19 W4M
Location Alias 2: 00/04-19-055-19 W4/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 19
Section: 19
County/Municipality: Lamont County
Well Name: WESTBOW BPX Redwater 4-19-55-19
Operator Name: Shoreline Energy Corp.
License Number: 0152708
License Date: 1992-06-09
License Status: Abandoned
Spud Date: 1992-06-26
Final Drill Date: 1992-06-29
Well Total Depth: 948.00 m
Surface Hole Latitude: 53.761700
Surface Hole Longitude: -112.824375

For data sources see[1][2]

Well History

Date Event
1992-06-09 Obtained License
1992-06-27 Surface Casing Operation Performed
1992-06-29 Finished Drilling
1992-06-29 Well Mode changed to Drilled and Cased
1992-06-30 Production Casing Operation Performed
1992-06-30 Rig Released
1992-06-30 Well Log Performed
1992-07-14 Well Log Performed
1992-07-15 Perforation Treatment Performed - Jet Perforation
1992-07-15 Well Log Performed
1992-07-20 Well Began Production
1992-07-20 Well Fluid changed to Crude Oil
1992-07-20 Well Mode changed to Flowing
1992-08-06 Perforation Treatment Performed - Cement Squeeze
1992-08-06 Perforation Treatment Performed - Jet Perforation
1992-08-06 Well Log Performed
1992-08-12 Perforation Treatment Performed - Fractured
1992-09-14 Well Log Performed
1992-12-18 Well Fluid changed to Crude Oil
1992-12-18 Well Mode changed to Suspended
2002-07-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-07-25 Plug Back Performed
2002-07-25 Well Fluid changed to Crude Oil
2002-07-25 Well Mode changed to Abandoned Zone
2003-06-05 Well Abandoned
2003-06-05 Well Fluid changed to Crude Oil
2003-06-05 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-07-15 Perforation 944.00 946.00 13
1992-08-06 Cement Squeeze 944.00 946.00 0
1992-08-06 Perforation 935.00 940.00 13
1992-08-12 Fracture 935.00 940.00 0
2002-07-25 Packing Device Capped w/Cement 922.00 930.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 1006 0.0 0.0 0.0

For data sources see[5]

References