If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0554192911020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.784942,"lon":-112.803617,"icon":""}]} |
| Location: 02/11-29-055-19W4/0 | |
| Location Alias: 02/11-29-55-19 W4M | |
| Location Alias 2: 02/11-29-055-19 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 055 | |
| Meridian: 4 | |
| Range: 19 | |
| Section: 29 | |
| County/Municipality: Lamont County | |
| Well Name: TAC REDWATER 11-29-55-19 | |
| Operator Name: Tamarack Acquisition Corp. | |
| License Number: 0446244 | |
| License Date: 2012-06-01 | |
| License Status: Issued | |
| Spud Date: 2012-06-19 | |
| Final Drill Date: 2012-06-25 | |
| Well Total Depth: 1380.00 m | |
| Surface Hole Latitude: 53.784942 | |
| Surface Hole Longitude: -112.803617 |
| Date | Event |
|---|---|
| 2012-06-01 | Obtained License |
| 2012-06-19 | Surface Casing Operation Performed |
| 2012-06-20 | Direction Drilling Operation Performed - Deviate |
| 2012-06-20 | Well Log Performed |
| 2012-06-21 | Direction Drilling Operation Performed - Horizontal |
| 2012-06-22 | Intermediate Casing Operation Performed |
| 2012-06-25 | Finished Drilling |
| 2012-06-25 | Liner Casing Operation Performed |
| 2012-06-25 | Perforation Treatment Performed - Open-Hole Completion |
| 2012-06-25 | Well Mode changed to Drilled and Cased |
| 2012-06-26 | Rig Released |
| 2012-07-10 | Well Log Performed |
| 2012-07-13 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-09-08 | Perforation Treatment Performed - Jet Perforation |
| 2012-09-08 | Well Log Performed |
| 2012-09-09 | Perforation Treatment Performed - Remedial Casing |
| 2012-09-12 | Well Log Performed |
| 2012-09-14 | Perforation Treatment Performed - Jet Perforation |
| 2012-09-14 | Well Log Performed |
| 2012-09-15 | Perforation Treatment Performed - Remedial Casing |
| 2012-09-17 | Well Log Performed |
| 2012-09-18 | Perforation Treatment Performed - Jet Perforation |
| 2012-09-18 | Well Log Performed |
| 2012-09-19 | Perforation Treatment Performed - Remedial Casing |
| 2012-09-21 | Well Log Performed |
| 2012-10-12 | Well Began Production |
| 2012-10-12 | Well Fluid changed to Crude Oil |
| 2012-10-12 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-06-19 | Akita Drilling Ltd. | 30 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-06-20 | 347.20 | Deviate (5 - 79 degrees) |
| 2012-06-21 | 791.70 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-06-25 | Open Hole/Barefoot Completion | 1370.90 | 1380.00 | 0 |
| 2012-09-09 | Remedial Casing Cementing | 716.50 | 719.50 | 0 |
| 2012-09-14 | Perforation | 552.00 | 555.00 | 17 |
| 2012-09-15 | Remedial Casing Cementing | 552.00 | 555.00 | 0 |
| 2012-09-18 | Perforation | 382.00 | 385.00 | 17 |
| 2012-09-19 | Remedial Casing Cementing | 382.00 | 385.00 | 0 |
| 2012-07-13 | Multi-Stage Fracture | 1343.90 | 1344.90 | 0 |
| 2012-07-13 | Multi-Stage Fracture | 1277.50 | 1278.50 | 0 |
| 2012-07-13 | Multi-Stage Fracture | 1218.60 | 1219.60 | 0 |
| 2012-07-13 | Multi-Stage Fracture | 1138.90 | 1139.90 | 0 |
| 2012-07-13 | Multi-Stage Fracture | 1058.90 | 1059.90 | 0 |
| 2012-07-13 | Multi-Stage Fracture | 978.80 | 979.90 | 0 |
| 2012-07-13 | Multi-Stage Fracture | 886.70 | 887.70 | 0 |
| 2012-09-08 | Perforation | 716.50 | 719.50 | 17 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 1931 | 0.0 | 0.0 | 0.0 |
| 2013 | 8127 | 0.0 | 0.0 | 0.0 |
| 2014 | 8340 | 0.0 | 0.0 | 0.0 |
| 2015 | 8458 | 0.0 | 0.0 | 0.0 |
| 2016 | 8061 | 0.0 | 0.0 | 0.0 |
| 2017 | 7728 | 0.0 | 0.0 | 0.0 |
| 2018 | 8495 | 0.0 | 0.0 | 0.0 |
| 2019 | 7245 | 0.0 | 0.0 | 0.0 |
| 2020 | 230 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-06-26 | No Incident Encountered | 0.00 | 0.00 |
| 2012-10-04 | No Incident Encountered | 0.00 | 0.00 |
| 2012-10-03 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]