If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0554202209000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.776148,"lon":-112.879557,"icon":""}]} |
Location: 00/09-22-055-20W4/0 | |
Location Alias: 00/09-22-55-20 W4M | |
Location Alias 2: 00/09-22-055-20 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 055 | |
Meridian: 4 | |
Range: 20 | |
Section: 22 | |
County/Municipality: Lamont County | |
Well Name: TAC HZ REDWATER 9-22-55-20 | |
Operator Name: Tamarack Acquisition Corp. | |
License Number: 0455269 | |
License Date: 2013-02-20 | |
License Status: Issued | |
Spud Date: 2013-03-04 | |
Final Drill Date: 2013-03-07 | |
Well Total Depth: 1450.00 m | |
Surface Hole Latitude: 53.776148 | |
Surface Hole Longitude: -112.879557 |
Date | Event |
---|---|
2013-02-20 | Obtained License |
2013-03-05 | Direction Drilling Operation Performed - Deviate |
2013-03-05 | Surface Casing Operation Performed |
2013-03-06 | Direction Drilling Operation Performed - Horizontal |
2013-03-07 | Finished Drilling |
2013-03-07 | Well Log Performed |
2013-03-07 | Well Mode changed to Drilled and Cased |
2013-03-08 | Production Casing Operation Performed |
2013-03-08 | Rig Released |
2013-03-19 | Well Log Performed |
2013-03-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-03-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-04-06 | Well Began Production |
2013-04-06 | Well Fluid changed to Crude Oil |
2013-04-06 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2013-03-04 | Ensign Drilling Inc. | 521 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2013-03-05 | 455.40 | Deviate (5 - 79 degrees) |
2013-03-06 | 888.70 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-03-22 | Multi-Stage Fracture | 1405.70 | 1405.80 | 0 |
2013-03-23 | Multi-Stage Fracture | 933.20 | 933.30 | 0 |
2013-03-22 | Multi-Stage Fracture | 1365.40 | 1365.50 | 0 |
2013-03-23 | Multi-Stage Fracture | 1311.80 | 1311.90 | 0 |
2013-03-23 | Multi-Stage Fracture | 1231.40 | 1231.50 | 0 |
2013-03-23 | Multi-Stage Fracture | 1188.10 | 1188.20 | 0 |
2013-03-23 | Multi-Stage Fracture | 1134.40 | 1134.50 | 0 |
2013-03-23 | Multi-Stage Fracture | 1080.70 | 1080.80 | 0 |
2013-03-23 | Multi-Stage Fracture | 1027.10 | 1027.20 | 0 |
2013-03-23 | Multi-Stage Fracture | 973.50 | 973.60 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-03-22 | 2013-03-23 | 739 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | No specific ingredients | Not Available | 100 | 81.5281 | N/A | |||
Sand (16/30) | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 17.5333 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 17.5333 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 17.5334 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 17.5333 | N/A | ||||
Tolcide PS75LT | Canyon | Bactericide/Biocide | Non-hazardous base ingredient(s) | Not Available | 100 | 0.0132 | N/A | |
Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0132 | N/A | ||||
CAN-2301 Breaker (Oxidizer) | Canyon | Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.0876 | N/A | |
Non-hazardous base ingredient(s) | Not Available | 100 | 0.0876 | N/A | ||||
CAN-2200 Crosslinker / pH buffer (Borate) | Canyon | Crosslinker | Boric Acid | 10043-35-3 | 100 | 0.1921 | N/A | |
Monoethanolamine | 141-43-5 | 100 | 0.1921 | N/A | ||||
Non-hazardous base ingredient(s) | Not Available | 100 | 0.1921 | N/A | ||||
CAN-2000 Gellant (Guar) | Canyon | Gelling Agent | Polysacharide Suspension | Not Available | 100 | 0.5038 | N/A | |
CAN-2410 Demulsifier | Canyon | Surfactant | Methyl Alcohol | 67-56-1 | 100 | 0.1415 | N/A | |
Non-hazardous base ingredient(s) | Not Available | 100 | 0.1415 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2013-03-20 | 2013-03-20 | Municipal Water | 510 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 6447 | 0.0 | 0.0 | 0.0 |
2014 | 8707 | 0.0 | 0.0 | 0.0 |
2015 | 8727 | 0.0 | 0.0 | 0.0 |
2016 | 8755 | 0.0 | 0.0 | 0.0 |
2017 | 8587 | 0.0 | 0.0 | 0.0 |
2018 | 7812 | 0.0 | 0.0 | 0.0 |
2019 | 8053 | 0.0 | 0.0 | 0.0 |
2020 | 2064 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-03-08 | No Incident Encountered | 0.00 | 0.00 |
2013-04-01 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]