If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0554202215000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.769562,"lon":-112.903726,"icon":""}]} |
Location: 00/15-22-055-20W4/0 | |
Location Alias: 00/15-22-55-20 W4M | |
Location Alias 2: 00/15-22-055-20 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 055 | |
Meridian: 4 | |
Range: 20 | |
Section: 22 | |
County/Municipality: Lamont County | |
Well Name: TAC HZ REDWATER 15-22-55-20 | |
Operator Name: Tamarack Acquisition Corp. | |
License Number: 0418528 | |
License Date: 2010-02-11 | |
License Status: Suspension | |
Spud Date: 2010-03-08 | |
Final Drill Date: 2010-03-17 | |
Well Total Depth: 2066.00 m | |
Surface Hole Latitude: 53.769562 | |
Surface Hole Longitude: -112.903726 |
Date | Event |
---|---|
2010-02-11 | Obtained License |
2010-03-08 | Surface Casing Operation Performed |
2010-03-09 | Direction Drilling Operation Performed - Horizontal |
2010-03-10 | Well Log Performed |
2010-03-11 | Production Casing Operation Performed |
2010-03-11 | Well Log Performed |
2010-03-17 | Finished Drilling |
2010-03-17 | Well Log Performed |
2010-03-17 | Well Structure changed to Drain |
2010-03-26 | Perforation Treatment Performed - Open-Hole Completion |
2010-03-26 | Rig Released |
2010-08-18 | Perforation Treatment Performed - Jet Perforation |
2010-08-18 | Well Log Performed |
2010-12-12 | Well Log Performed |
2010-12-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-03-09 | 466.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-03-26 | Open Hole/Barefoot Completion | 933.00 | 2066.00 | 0 |
2010-08-18 | Perforation | 892.00 | 923.00 | 20 |
2010-12-16 | Acid Treatment | 892.00 | 923.00 | 0 |
For data sources see[5]