X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554202603000

Well Details

Well ID: 0554202603000
Loading map...
Location: 00/03-26-055-20W4/0
Location Alias: 00/03-26-55-20 W4M
Location Alias 2: 00/03-26-055-20 W4/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 20
Section: 26
County/Municipality: Lamont County
Well Name: TAC HZ REDWATER 3-26-55-20
Operator Name: Tamarack Acquisition Corp.
License Number: 0442550
License Date: 2012-01-09
License Status: Issued
Spud Date: 2012-05-16
Final Drill Date: 2012-05-20
Well Total Depth: 1515.00 m
Surface Hole Latitude: 53.775758
Surface Hole Longitude: -112.879561

For data sources see[1][2]

Well History

Date Event
2012-01-09 Obtained License
2012-05-17 Surface Casing Operation Performed
2012-05-18 Direction Drilling Operation Performed - Horizontal
2012-05-20 Finished Drilling
2012-05-20 Production Casing Operation Performed
2012-05-20 Well Log Performed
2012-05-20 Well Mode changed to Drilled and Cased
2012-05-21 Rig Released
2012-05-22 Well Log Performed
2012-05-31 Perforation Treatment Performed - Multi-Stage Fracture
2012-06-01 Well Began Production
2012-06-01 Well Fluid changed to Crude Oil
2012-06-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-05-16 Precision Drilling Corporation 137 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-05-18 474.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-05-31 Multi-Stage Fracture 949.50 949.80 0
2012-05-31 Multi-Stage Fracture 1401.10 1401.40 0
2012-05-31 Multi-Stage Fracture 1449.90 1450.20 0
2012-05-31 Multi-Stage Fracture 1496.60 1496.90 0
2012-05-31 Multi-Stage Fracture 1004.50 1004.80 0
2012-05-31 Multi-Stage Fracture 1051.20 1051.50 0
2012-05-31 Multi-Stage Fracture 1100.60 1100.90 0
2012-05-31 Multi-Stage Fracture 1155.60 1155.90 0
2012-05-31 Multi-Stage Fracture 1202.30 1202.60 0
2012-05-31 Multi-Stage Fracture 1249.50 1249.80 0
2012-05-31 Multi-Stage Fracture 1304.50 1304.80 0
2012-05-31 Multi-Stage Fracture 1348.70 1349.00 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 4908 0.0 0.0 0.0
2013 8537 0.0 0.0 0.0
2014 8696 0.0 0.0 0.0
2015 8735 0.0 0.0 0.0
2016 8539 0.0 0.0 0.0
2017 8687 0.0 0.0 0.0
2018 8555 0.0 0.0 0.0
2019 6118 0.0 0.0 0.0
2020 1942 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-05-21 No Incident Encountered 0.00 0.00
2012-06-05 No Incident Encountered 0.00 0.00

For data sources see[8]

References