If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0554203503000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.790899,"lon":-112.879535,"icon":""}]} |
| Location: 00/03-35-055-20W4/0 | |
| Location Alias: 00/03-35-55-20 W4M | |
| Location Alias 2: 00/03-35-055-20 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 055 | |
| Meridian: 4 | |
| Range: 20 | |
| Section: 35 | |
| County/Municipality: Lamont County | |
| Well Name: TAC REDWATER 3-35-55-20 | |
| Operator Name: Tamarack Acquisition Corp. | |
| License Number: 0413649 | |
| License Date: 2009-11-04 | |
| License Status: Issued | |
| Spud Date: 2010-02-02 | |
| Final Drill Date: 2010-02-09 | |
| Well Total Depth: 1568.00 m | |
| Surface Hole Latitude: 53.790899 | |
| Surface Hole Longitude: -112.879535 |
| Date | Event |
|---|---|
| 2009-11-04 | Obtained License |
| 2010-02-02 | Surface Casing Operation Performed |
| 2010-02-03 | Direction Drilling Operation Performed - Deviate |
| 2010-02-05 | Intermediate Casing Operation Performed |
| 2010-02-05 | Well Log Performed |
| 2010-02-06 | Direction Drilling Operation Performed - Horizontal |
| 2010-02-09 | Finished Drilling |
| 2010-02-09 | Well Log Performed |
| 2010-02-09 | Well Mode changed to Drilled and Cased |
| 2010-02-10 | Liner Casing Operation Performed |
| 2010-02-11 | Rig Released |
| 2010-03-04 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2010-08-04 | Well Began Production |
| 2010-08-04 | Well Fluid changed to Crude Oil |
| 2010-08-04 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2010-02-03 | 146.00 | Deviate (5 - 79 degrees) |
| 2010-02-06 | 840.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2010-03-04 | Multi-Stage Fracture | 1511.30 | 1512.60 | 0 |
| 2010-03-04 | Multi-Stage Fracture | 1402.00 | 1427.30 | 0 |
| 2010-03-04 | Multi-Stage Fracture | 1306.80 | 1320.60 | 0 |
| 2010-03-04 | Multi-Stage Fracture | 1198.20 | 1211.90 | 0 |
| 2010-03-04 | Multi-Stage Fracture | 1105.30 | 1118.20 | 0 |
| 2010-03-04 | Multi-Stage Fracture | 994.60 | 995.40 | 0 |
| 2010-03-04 | Multi-Stage Fracture | 906.70 | 907.50 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2010 | 2957 | 0.0 | 0.0 | 0.0 |
| 2011 | 8473 | 0.0 | 0.0 | 0.0 |
| 2012 | 8518 | 0.0 | 0.0 | 0.0 |
| 2013 | 8490 | 0.0 | 0.0 | 0.0 |
| 2014 | 7871 | 0.0 | 0.0 | 0.0 |
| 2015 | 8500 | 0.0 | 0.0 | 0.0 |
| 2016 | 8440 | 0.0 | 0.0 | 0.0 |
| 2017 | 8341 | 0.0 | 0.0 | 0.0 |
| 2018 | 8148 | 0.0 | 0.0 | 0.0 |
| 2019 | 7788 | 0.0 | 0.0 | 0.0 |
| 2020 | 1649 | 0.0 | 0.0 | 0.0 |
For data sources see[6]