X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554221010000

Well Details

Well ID: 0554221010000
Loading map...
Location: 00/10-10-055-22W4/0
Location Alias: 00/10-10-55-22 W4M
Location Alias 2: 00/10-10-055-22 W4/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 22
Section: 10
County/Municipality: Fort Saskatchewan
Well Name: DOW 1 FORT SK NACL 10-10-55-22
Operator Name: Dow Chemical Canada ULC
License Number: 0030755
License Date: 1966-07-29
License Status: RecExempt
Spud Date: 1966-08-07
Final Drill Date: 1966-08-30
Well Total Depth: 1882.10 m
Surface Hole Latitude: 53.740092
Surface Hole Longitude: -113.184052

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-07-29 Obtained License
1966-08-07 Lost Circulation Occurred
1966-08-24 Production Casing Operation Performed
1966-08-30 Finished Drilling
1966-08-30 Perforation Treatment Performed - Open-Hole Completion
1966-08-30 Well Mode changed to Drilled and Cased
1968-06-15 Well Fluid changed to Brine
1975-04-18 Well Began Injection
1975-04-18 Well Fluid changed to Water
1975-04-18 Well Type changed to Disposal
1977-03-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-03-23 Well Fluid changed to Water
1977-03-23 Well Mode changed to Abandoned Zone
1977-03-23 Well Type changed to Disposal
1977-03-24 Perforation Treatment Performed - Abrasa-Jet Perforation
1977-03-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-06-18 Well Log Performed
1983-08-16 Well Log Performed
1983-12-06 Well Log Performed
1984-09-18 Well Log Performed
1985-11-15 Well Log Performed
1986-01-08 Well Log Performed
1986-02-25 Well Log Performed
1986-08-28 Well Log Performed
1987-12-15 Well Log Performed
1988-10-25 Well Log Performed
1989-09-14 Well Log Performed
1989-11-29 Well Log Performed
1989-11-30 Well Log Performed
1990-01-25 Well Log Performed
1990-04-25 Perforation Treatment Performed - Cement Plug
1990-04-25 Plug Back Performed
1990-04-25 Well Abandoned
1990-04-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-04-26 Plug Back Performed
1990-05-01 Perforation Treatment Performed - Cement Plug
1990-05-01 Plug Back Performed
2008-10-21 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-08-30 Open Hole/Barefoot Completion 1639.20 1882.10 0
1977-03-24 Hydra Jet Perforation 1089.40 1091.80 0
1977-03-29 Acid Treatment 1035.10 1091.80 0
1990-04-25 Cement Plug 309.00 355.00 0
1990-04-26 Packing Device Capped w/Cement 285.00 300.00 0
1990-05-01 Cement Plug 14.60 40.00 0
1977-03-23 Packing Device Capped w/Cement 1549.90 1597.80 0
1977-03-24 Hydra Jet Perforation 1035.10 1037.50 0
1977-03-24 Hydra Jet Perforation 1041.80 1044.20 0
1977-03-24 Hydra Jet Perforation 1046.10 1048.50 0
1977-03-24 Hydra Jet Perforation 1054.60 1057.00 0
1977-03-24 Hydra Jet Perforation 1061.90 1064.40 0
1977-03-24 Hydra Jet Perforation 1075.90 1078.40 0
1977-03-24 Hydra Jet Perforation 1080.80 1083.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1966-08-07 Lost Circulation 10.70 10.70

For data sources see[6]

References