X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0555022206000

Well Details

Well ID: 0555022206000
Loading map...
Location: 00/06-22-055-02W5/0
Location Alias: 00/06-22-55-02 W5M
Location Alias 2: 00/06-22-055-02 W5/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 5
Range: 02
Section: 22
County/Municipality: Lac Ste. Anne County
Well Name: NOVUS CARDIFF 6-22-55-2
Operator Name: Novus Energy Inc.
License Number: 0106305
License Date: 1984-03-02
License Status: Suspension
Spud Date: 1984-03-09
Final Drill Date: 1984-03-14
Well Total Depth: 1438.00 m
Surface Hole Latitude: 53.765646
Surface Hole Longitude: -114.218034

For data sources see[1][2]

Well History

Date Event
1984-03-02 Obtained License
1984-03-14 Finished Drilling
1984-03-14 Well Log Performed
1984-03-15 Drill Stem Test Performed
1984-03-17 Production Casing Operation Performed
1984-05-05 Perforation Treatment Performed - Jet Perforation
1984-05-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-05-09 Perforation Treatment Performed - Cement Squeeze
1984-05-18 Perforation Treatment Performed - Abrasa-Jet Perforation
1984-05-21 Perforation Treatment Performed - Acid Wash - No Pressure
1984-05-21 Well Log Performed
1984-05-22 Perforation Treatment Performed - Abrasa-Jet Perforation
1984-05-24 Perforation Treatment Performed - Jet Perforation
1984-06-01 Well Mode changed to Drilled and Cased
2011-03-15 Perforation Treatment Performed - Jet Perforation
2011-03-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-06-07 Well Began Production
2011-06-07 Well Fluid changed to Crude Oil
2011-06-07 Well Mode changed to Pumping
2012-12-01 Well Fluid changed to Crude Oil
2012-12-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-05-05 Perforation 1394.00 1398.50 7
2011-03-17 Acid Treatment 1394.50 1396.00 0
2011-03-17 Acid Treatment 1391.00 1392.50 0
2011-03-17 Acid Treatment 1387.00 1389.50 0
2011-03-17 Acid Treatment 1381.00 1383.00 0
2011-03-17 Acid Treatment 1376.00 1379.00 0
1984-05-07 Acid Treatment 1394.00 1398.50 0
1984-05-09 Cement Squeeze 1394.00 1398.50 0
1984-05-18 Hydra Jet Perforation 1394.50 1396.00 0
1984-05-21 Acid Wash 1394.50 1396.00 0
1984-05-22 Hydra Jet Perforation 1391.00 1392.50 0
1984-05-24 Perforation 1387.00 1389.50 0
2011-03-15 Perforation 1381.00 1383.00 17
2011-03-15 Perforation 1376.00 1379.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 4944 0.0 0.0 0.0
2012 48 0.0 0.0 0.0

For data sources see[5]

References