If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0555053206000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.793726,"lon":-114.709175,"icon":""}]} |
| Location: 00/06-32-055-05W5/0 | |
| Location Alias: 00/06-32-55-05 W5M | |
| Location Alias 2: 00/06-32-055-05 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 055 | |
| Meridian: 5 | |
| Range: 05 | |
| Section: 32 | |
| County/Municipality: Lac Ste. Anne County | |
| Well Name: LONG RUN CHERHILL 6-32-55-5 | |
| Operator Name: Long Run Exploration Ltd. | |
| License Number: 0178123 | |
| License Date: 1995-05-26 | |
| License Status: Suspension | |
| Spud Date: 1995-06-05 | |
| Final Drill Date: 1995-06-11 | |
| Well Total Depth: 1448.00 m | |
| Surface Hole Latitude: 53.793726 | |
| Surface Hole Longitude: -114.709175 |
| Date | Event |
|---|---|
| 1995-05-26 | Obtained License |
| 1995-06-06 | Lost Circulation Occurred |
| 1995-06-06 | Surface Casing Operation Performed |
| 1995-06-11 | Finished Drilling |
| 1995-06-11 | Well Log Performed |
| 1995-06-11 | Well Mode changed to Drilled and Cased |
| 1995-06-12 | Drill Stem Test Performed |
| 1995-06-13 | Drill Stem Test Performed |
| 1995-06-14 | Production Casing Operation Performed |
| 1995-06-14 | Rig Released |
| 1995-06-28 | Perforation Treatment Performed - Jet Perforation |
| 1995-06-28 | Well Began Production |
| 1995-06-28 | Well Fluid changed to Crude Oil |
| 1995-06-28 | Well Mode changed to Pumping |
| 2001-11-08 | Perforation Treatment Performed - Bridge Plug No Cement Required |
| 2001-11-08 | Well Log Performed |
| 2001-11-09 | Perforation Treatment Performed - Jet Perforation |
| 2001-11-09 | Well Log Performed |
| 2002-10-01 | Well Fluid changed to Crude Oil |
| 2002-10-01 | Well Mode changed to Suspended |
| 2005-05-28 | Perforation Treatment Performed - Jet Perforation |
| 2018-12-18 | Perforation Treatment Performed - Cement Plug |
| 2018-12-18 | Plug Back Performed |
| 2018-12-18 | Well Fluid changed to Crude Oil |
| 2018-12-18 | Well Mode changed to Abandoned Zone |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1995-06-28 | Perforation | 1416.00 | 1418.00 | 13 |
| 2001-11-08 | Bridge Plug, No Cement | 1415.50 | 1418.00 | 0 |
| 2001-11-09 | Perforation | 1387.00 | 1388.50 | 17 |
| 2005-05-28 | Perforation | 1406.50 | 1408.00 | 17 |
| 2018-12-18 | Cement Plug | 1265.00 | 1415.50 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1995 | 2635 | 0.0 | 0.0 | 0.0 |
| 1996 | 7510 | 0.0 | 0.0 | 0.0 |
| 1997 | 5691 | 0.0 | 0.0 | 0.0 |
| 1998 | 7309 | 0.0 | 0.0 | 0.0 |
| 1999 | 8207 | 0.0 | 0.0 | 0.0 |
| 2000 | 8425 | 0.0 | 0.0 | 0.0 |
| 2001 | 6158 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1995-06-06 | Lost Circulation | 100.00 | 123.00 |
| 2018-12-19 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]