X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0555061401000

Well Details

Well ID: 0555061401000
Loading map...
Location: 00/01-14-055-06W5/0
Location Alias: 00/01-14-55-06 W5M
Location Alias 2: 00/01-14-055-06 W5/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 5
Range: 06
Section: 14
County/Municipality: Lac Ste. Anne County
Well Name: PENMAX ET AL CHERHILL 1-14-55-6
Operator Name: Enerplus Corporation
License Number: 0162806
License Date: 1993-12-03
License Status: RecCertified
Spud Date: 1993-12-07
Final Drill Date: 1993-12-13
Well Total Depth: 1520.00 m
Surface Hole Latitude: 53.747983
Surface Hole Longitude: -114.776556

For data sources see[1][2]

Well History

Date Event
1993-12-03 Obtained License
1993-12-08 Surface Casing Operation Performed
1993-12-13 Finished Drilling
1993-12-13 Well Log Performed
1993-12-13 Well Mode changed to Drilled and Cased
1993-12-14 Drill Stem Test Performed
1993-12-15 Drill Stem Test Performed
1993-12-17 Production Casing Operation Performed
1993-12-17 Rig Released
1993-12-21 Perforation Treatment Performed - Jet Perforation
1993-12-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-01-12 Well Began Production
1994-01-12 Well Fluid changed to Crude Oil
1994-01-12 Well Mode changed to Flowing
1994-01-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-03-01 Well Fluid changed to Crude Oil
1994-03-01 Well Mode changed to Suspended
1996-11-07 Well Fluid changed to Crude Oil
1996-11-07 Well Mode changed to Closed
1996-12-03 Well Fluid changed to Crude Oil
1996-12-03 Well Mode changed to Suspended
1997-10-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-10-02 Plug Back Performed
1997-10-03 Well Abandoned
1997-10-03 Well Fluid changed to Crude Oil
1997-10-03 Well Log Performed
1997-10-03 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-12-21 Perforation 1473.00 1478.00 13
1993-12-22 Acid Treatment 1473.00 1478.00 0
1994-01-27 Acid Treatment 1473.00 1478.00 0
1997-10-02 Packing Device Capped w/Cement 1452.00 1460.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 72 0.0 0.0 0.0
1994 321 0.0 0.0 0.0

For data sources see[5]

References