X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0555141809000

Well Details

Well ID: 0555141809000
Loading map...
Location: 00/09-18-055-14W5/0
Location Alias: 00/09-18-55-14 W5M
Location Alias 2: 00/09-18-055-14 W5/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 5
Range: 14
Section: 18
County/Municipality: Yellowhead County
Well Name: VELVET HZ MCLEOD 9-18-55-14
Operator Name: Velvet Energy Ltd.
License Number: 0490220
License Date: 2018-07-26
License Status: Issued
Spud Date: 2018-09-03
Final Drill Date: 2018-09-15
Well Total Depth: 5320.00 m
Surface Hole Latitude: 53.756034
Surface Hole Longitude: -116.105758

For data sources see[1][2]

Well History

Date Event
2018-07-26 Obtained License
2018-09-04 Surface Casing Operation Performed
2018-09-06 Direction Drilling Operation Performed - Deviate
2018-09-07 Direction Drilling Operation Performed - Horizontal
2018-09-07 Intermediate Casing Operation Performed
2018-09-07 Well Log Performed
2018-09-15 Finished Drilling
2018-09-15 Well Log Performed
2018-09-16 Well Mode changed to Drilled and Cased
2018-09-18 Production Casing Operation Performed
2018-09-19 Rig Released
2018-09-29 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-29 Perforation Treatment Performed - Open-Hole Completion
2018-10-21 Well Began Production
2018-10-21 Well Fluid changed to Gas
2018-10-21 Well Mode changed to Flowing
2018-12-09 Well Fluid changed to Gas
2018-12-09 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-09-03 Savanna Drilling Corp. 685 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-09-06 1935.10 Deviate (5 - 79 degrees)
2018-09-07 2226.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-09-29 Open Hole/Barefoot Completion 5315.70 5320.00 0
2018-09-29 Multi-Stage Fracture 4542.30 4542.40 0
2018-09-29 Multi-Stage Fracture 4449.80 4449.90 0
2018-09-29 Multi-Stage Fracture 4359.50 4359.60 0
2018-09-29 Multi-Stage Fracture 4267.20 4267.30 0
2018-09-29 Multi-Stage Fracture 4175.70 4175.80 0
2018-09-29 Multi-Stage Fracture 4082.10 4082.20 0
2018-09-29 Multi-Stage Fracture 3987.80 3987.90 0
2018-09-29 Multi-Stage Fracture 3894.30 3894.40 0
2018-09-29 Multi-Stage Fracture 3799.90 3800.00 0
2018-09-29 Multi-Stage Fracture 3708.10 3708.20 0
2018-09-29 Multi-Stage Fracture 5310.90 5311.00 0
2018-09-29 Multi-Stage Fracture 3612.80 3612.90 0
2018-09-29 Multi-Stage Fracture 3520.60 3520.70 0
2018-09-29 Multi-Stage Fracture 3425.70 3425.80 0
2018-09-29 Multi-Stage Fracture 3330.30 3330.40 0
2018-09-29 Multi-Stage Fracture 3235.90 3236.00 0
2018-09-29 Multi-Stage Fracture 3141.20 3141.30 0
2018-09-29 Multi-Stage Fracture 3047.20 3047.30 0
2018-09-29 Multi-Stage Fracture 2954.20 2954.30 0
2018-09-29 Multi-Stage Fracture 2859.40 2859.50 0
2018-09-29 Multi-Stage Fracture 2766.70 2766.80 0
2018-09-29 Multi-Stage Fracture 5213.50 5213.60 0
2018-09-29 Multi-Stage Fracture 2676.20 2676.30 0
2018-09-29 Multi-Stage Fracture 2581.50 2581.60 0
2018-09-29 Multi-Stage Fracture 2487.80 2487.90 0
2018-09-29 Multi-Stage Fracture 2393.70 2393.80 0
2018-09-29 Multi-Stage Fracture 2300.00 2300.10 0
2018-09-29 Multi-Stage Fracture 5108.70 5108.80 0
2018-09-29 Multi-Stage Fracture 5002.60 5002.70 0
2018-09-29 Multi-Stage Fracture 4910.40 4910.50 0
2018-09-29 Multi-Stage Fracture 4820.00 4820.10 0
2018-09-29 Multi-Stage Fracture 4728.20 4728.30 0
2018-09-29 Multi-Stage Fracture 4636.40 4636.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-09-29 2018-09-29 2,150 4,800 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 77.5185 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 11.0329 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 5.4621 N/A
SaniFrac 8844 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0103 N/A
Acetonitrile. 2.2-dibromo 3252-43-5 100 0.0103 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0103 N/A
Polyethylene glycol 25322-68-3 100 0.0103 N/A
Sodium bromide 7647-15-6 100 0.0103 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.0703 N/A
DWP-959 Calfrac Demulsifier Methanol 67-56-1 100 0.0751 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0751 N/A
Nitrogen Calfrac Energizing Fluid Nitrogen 7727-37-9 100 5.7474 N/A
CalVisc Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.083 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-09-28 2018-09-29 Surface Water - Lake 4800

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 1490 0.0 0.0 0.0
2019 7523 0.0 0.0 0.0
2020 2033 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-09-19 No Incident Encountered 0.00 0.00
2018-09-29 No Incident Encountered 0.00 0.00

For data sources see[10]

References