X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0555181816002

Well Details

Well ID: 0555181816002
Loading map...
Location: 00/16-18-055-18W5/2
Location Alias: 00/16-18-55-18 W5M
Location Alias 2: 00/16-18-055-18 W5/02
Country: Canada
Province: Alberta
Township: 055
Meridian: 5
Range: 18
Section: 18
County/Municipality: Yellowhead County
Well Name: SOC PINE CK 16-18-55-18
Operator Name: AlphaBow Energy Ltd.
License Number: 0071462
License Date: 1978-08-18
License Status: Issued
Spud Date: 1978-09-26
Final Drill Date: 1978-10-19
Well Total Depth: 2200.00 m
Surface Hole Latitude: 53.755753
Surface Hole Longitude: -116.656989

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-08-18 Obtained License
1978-10-14 Drill Stem Test Performed
1978-10-15 Drill Stem Test Performed
1978-10-19 Finished Drilling
1978-10-19 Well Mode changed to Drilled and Cased
1978-10-21 Production Casing Operation Performed
1978-12-02 Perforation Treatment Performed - Jet Perforation
1978-12-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-12-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-12-12 Perforation Treatment Performed - Fractured
1978-12-12 Perforation Treatment Performed - Jet Perforation
1980-09-26 Perforation Treatment Performed - Jet Perforation
1980-10-03 Perforation Treatment Performed - Fractured
1980-10-07 Well Began Production
1980-10-07 Well Fluid changed to Crude Oil
1980-10-07 Well Mode changed to Flowing
1981-09-01 Well Structure changed to Commingled
2003-11-10 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-12-02 Perforation 2167.00 2173.00 13
1980-10-03 Fracture 1946.50 1956.50 0
2003-11-10 Perforation 1929.30 1930.50 17
1978-12-02 Perforation 2138.00 2147.00 13
1978-12-05 Acid Treatment 2138.00 2173.00 0
1978-12-07 Packing Device Capped w/Cement 2122.00 2130.00 0
1978-12-12 Perforation 1929.30 1930.50 7
1978-12-12 Fracture 1929.30 1930.50 0
1980-09-26 Perforation 1946.50 1949.50 13
1980-09-26 Perforation 1952.00 1953.00 13
1980-09-26 Perforation 1955.50 1956.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 600 0.0 0.0 0.0
1981 1537 0.0 0.0 0.0

For data sources see[5]

References