X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0555190806000

Well Details

Well ID: 0555190806000
Loading map...
Location: 00/06-08-055-19W5/0
Location Alias: 00/06-08-55-19 W5M
Location Alias 2: 00/06-08-055-19 W5/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 5
Range: 19
Section: 08
County/Municipality: Yellowhead County
Well Name: KRANG PINE 6-8-55-19
Operator Name: Harvest Operations Corp.
License Number: 0113926
License Date: 1985-03-12
License Status: Suspension
Spud Date: 1985-04-08
Final Drill Date: 1985-04-25
Well Total Depth: 2010.00 m
Surface Hole Latitude: 53.735126
Surface Hole Longitude: -116.794440

For data sources see[1][2]

Well History

Date Event
1985-03-12 Obtained License
1985-04-10 Surface Casing Operation Performed
1985-04-25 Finished Drilling
1985-04-25 Well Log Performed
1985-04-25 Well Mode changed to Drilled and Cased
1985-04-27 Production Casing Operation Performed
1985-04-27 Rig Released
1985-05-07 Well Log Performed
1985-05-08 Perforation Treatment Performed - Jet Perforation
1985-05-11 Perforation Treatment Performed - Fractured
1985-05-18 Well Began Production
1985-05-18 Well Fluid changed to Crude Oil
1985-05-18 Well Mode changed to Flowing
1996-09-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-09-27 Plug Back Performed
1996-09-27 Well Fluid changed to Crude Oil
1996-09-27 Well Mode changed to Abandoned Zone
1996-09-28 Perforation Treatment Performed - Jet Perforation
1996-09-28 Well Log Performed
2001-10-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-10-20 Perforation Treatment Performed - Jet Perforation
2001-10-20 Plug Back Performed
2001-10-20 Well Log Performed
2001-10-21 Perforation Treatment Performed - Cement Squeeze
2001-10-22 Well Abandoned
2005-06-07 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-05-08 Perforation 1954.00 1955.00 13
1985-05-08 Perforation 1956.00 1960.00 13
1985-05-11 Fracture 1954.00 1960.00 0
1996-09-27 Packing Device Capped w/Cement 1942.00 1950.00 0
1996-09-28 Perforation 1528.00 1533.00 20
1996-09-28 Perforation 1539.50 1543.00 20
2001-10-20 Packing Device Capped w/Cement 1512.00 1520.00 0
2001-10-20 Perforation 451.00 451.50 13
2001-10-21 Cement Squeeze 451.00 451.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 4795 0.0 0.0 0.0
1986 3759 0.0 0.0 0.0
1987 2937 0.0 0.0 0.0
1988 2891 0.0 0.0 0.0
1989 2748 0.0 0.0 0.0
1990 2660 0.0 0.0 0.0
1991 2572 0.0 0.0 0.0
1992 1372 0.0 0.0 0.0
1993 2866 0.0 0.0 0.0
1994 2564 0.0 0.0 0.0
1995 976 0.0 0.0 0.0
1996 264 0.0 0.0 0.0

For data sources see[5]

References