X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0555191405002

Well Details

Well ID: 0555191405002
Loading map...
Location: 00/05-14-055-19W5/2
Location Alias: 00/05-14-55-19 W5M
Location Alias 2: 00/05-14-055-19 W5/02
Country: Canada
Province: Alberta
Township: 055
Meridian: 5
Range: 19
Section: 14
County/Municipality: Yellowhead County
Well Name: MANCAL PINE CK 5-14-55-19
Operator Name: Mancal Energy Inc.
License Number: 0378671
License Date: 2007-06-27
License Status: Suspension
Spud Date: 2007-08-18
Final Drill Date: 2007-09-09
Well Total Depth: 2825.00 m
Surface Hole Latitude: 53.749015
Surface Hole Longitude: -116.720453

For data sources see[1][2]

Well History

Date Event
2007-06-27 Obtained License
2007-08-21 Surface Casing Operation Performed
2007-09-09 Finished Drilling
2007-09-09 Well Mode changed to Drilled and Cased
2007-09-10 Well Log Performed
2007-09-11 Production Casing Operation Performed
2007-09-12 Rig Released
2007-09-20 Well Log Performed
2007-09-22 Perforation Treatment Performed - Jet Perforation
2007-09-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-09-25 Well Log Performed
2007-09-26 Perforation Treatment Performed - Jet Perforation
2007-09-26 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2007-09-26 Plug Back Performed
2007-09-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-09-29 Well Log Performed
2007-09-30 Perforation Treatment Performed - Jet Perforation
2007-10-03 Well Log Performed
2007-10-08 Perforation Treatment Performed - Fractured
2007-10-16 Well Fluid changed to Gas
2007-10-16 Well Mode changed to Testing
2008-05-27 Well Began Production
2008-05-27 Well Fluid changed to Gas
2008-05-27 Well Mode changed to Flowing
2008-10-01 Well Log Performed
2008-10-02 Well Log Performed
2008-11-12 Well Log Performed
2008-11-21 Well Log Performed
2010-01-01 Well Fluid changed to Gas
2010-01-01 Well Mode changed to Suspended
2010-01-27 Perforation Treatment Performed - Cement Squeeze
2010-01-27 Plug Back Performed
2010-01-28 Well Log Performed
2010-01-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-01-29 Plug Back Performed
2010-01-29 Well Log Performed
2010-02-10 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-02-10 Perforation Treatment Performed - Fractured
2010-02-20 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-02-21 Perforation Treatment Performed - Fractured
2010-02-22 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2007-09-22 Perforation 2796.00 2798.00 20
2010-02-10 Fracture 2641.00 2642.00 0
2010-02-10 Hydra Jet Perforation 2641.00 2642.00 1
2010-02-20 Hydra Jet Perforation 2393.00 2394.00 1
2010-02-20 Hydra Jet Perforation 2374.00 2375.00 1
2010-02-20 Hydra Jet Perforation 2356.00 2357.00 1
2010-02-20 Hydra Jet Perforation 2518.00 2519.00 1
2010-02-20 Hydra Jet Perforation 2543.00 2544.00 1
2010-02-21 Fracture 2543.00 2544.00 0
2010-02-21 Fracture 2518.00 2519.00 0
2010-02-22 Fracture 2356.00 2357.00 0
2007-09-25 Acid Treatment 2796.00 2798.00 0
2010-02-22 Fracture 2393.00 2394.00 0
2010-02-22 Fracture 2374.00 2375.00 0
2007-09-26 Packing Dev Cpd w/Res-Gyp Cem 2791.00 2795.00 0
2007-09-26 Perforation 2773.00 2780.00 20
2007-09-28 Acid Treatment 2773.00 2780.00 0
2007-09-30 Perforation 2732.00 2735.00 20
2007-10-08 Fracture 2732.00 2735.00 0
2010-01-27 Cement Squeeze 2773.00 2780.00 0
2010-01-29 Packing Device Capped w/Cement 2717.00 2725.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 24 0.0 0.0 0.0
2008 1280 0.0 0.0 0.0

For data sources see[5]

References