If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0555191405008 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.749015,"lon":-116.720453,"icon":""}]} |
Location: 00/05-14-055-19W5/8 | |
Location Alias: 00/05-14-55-19 W5M | |
Location Alias 2: 00/05-14-055-19 W5/08 | |
Country: Canada | |
Province: Alberta | |
Township: 055 | |
Meridian: 5 | |
Range: 19 | |
Section: 14 | |
County/Municipality: Yellowhead County | |
Well Name: MANCAL PINE CK 5-14-55-19 | |
Operator Name: Mancal Energy Inc. | |
License Number: 0378671 | |
License Date: 2007-06-27 | |
License Status: Suspension | |
Spud Date: 2007-08-18 | |
Final Drill Date: 2007-09-09 | |
Well Total Depth: 2825.00 m | |
Surface Hole Latitude: 53.749015 | |
Surface Hole Longitude: -116.720453 |
Date | Event |
---|---|
2007-06-27 | Obtained License |
2007-08-21 | Surface Casing Operation Performed |
2007-09-09 | Finished Drilling |
2007-09-09 | Well Mode changed to Drilled and Cased |
2007-09-10 | Well Log Performed |
2007-09-11 | Production Casing Operation Performed |
2007-09-12 | Rig Released |
2007-09-20 | Well Log Performed |
2007-09-22 | Perforation Treatment Performed - Jet Perforation |
2007-09-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2007-09-25 | Well Log Performed |
2007-09-26 | Perforation Treatment Performed - Jet Perforation |
2007-09-26 | Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem |
2007-09-26 | Plug Back Performed |
2007-09-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2007-09-29 | Well Log Performed |
2007-09-30 | Perforation Treatment Performed - Jet Perforation |
2007-10-03 | Well Log Performed |
2007-10-08 | Perforation Treatment Performed - Fractured |
2008-10-01 | Well Log Performed |
2008-10-02 | Well Log Performed |
2008-11-12 | Well Log Performed |
2008-11-21 | Well Log Performed |
2010-01-27 | Perforation Treatment Performed - Cement Squeeze |
2010-01-27 | Plug Back Performed |
2010-01-28 | Well Log Performed |
2010-01-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-01-29 | Plug Back Performed |
2010-01-29 | Well Log Performed |
2010-02-10 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2010-02-10 | Perforation Treatment Performed - Fractured |
2010-02-20 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2010-02-21 | Perforation Treatment Performed - Fractured |
2010-02-22 | Perforation Treatment Performed - Fractured |
2010-03-10 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2007-09-22 | Perforation | 2796.00 | 2798.00 | 20 |
2010-02-10 | Fracture | 2641.00 | 2642.00 | 0 |
2010-02-10 | Hydra Jet Perforation | 2641.00 | 2642.00 | 1 |
2010-02-20 | Hydra Jet Perforation | 2393.00 | 2394.00 | 1 |
2010-02-20 | Hydra Jet Perforation | 2374.00 | 2375.00 | 1 |
2010-02-20 | Hydra Jet Perforation | 2356.00 | 2357.00 | 1 |
2010-02-20 | Hydra Jet Perforation | 2518.00 | 2519.00 | 1 |
2010-02-20 | Hydra Jet Perforation | 2543.00 | 2544.00 | 1 |
2010-02-21 | Fracture | 2543.00 | 2544.00 | 0 |
2010-02-21 | Fracture | 2518.00 | 2519.00 | 0 |
2010-02-22 | Fracture | 2356.00 | 2357.00 | 0 |
2007-09-25 | Acid Treatment | 2796.00 | 2798.00 | 0 |
2010-02-22 | Fracture | 2393.00 | 2394.00 | 0 |
2010-02-22 | Fracture | 2374.00 | 2375.00 | 0 |
2007-09-26 | Packing Dev Cpd w/Res-Gyp Cem | 2791.00 | 2795.00 | 0 |
2007-09-26 | Perforation | 2773.00 | 2780.00 | 20 |
2007-09-28 | Acid Treatment | 2773.00 | 2780.00 | 0 |
2007-09-30 | Perforation | 2732.00 | 2735.00 | 20 |
2007-10-08 | Fracture | 2732.00 | 2735.00 | 0 |
2010-01-27 | Cement Squeeze | 2773.00 | 2780.00 | 0 |
2010-01-29 | Packing Device Capped w/Cement | 2717.00 | 2725.00 | 0 |
For data sources see[4]