X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0555220601002

Well Details

Well ID: 0555220601002
Loading map...
Location: 00/01-06-055-22W5/2
Location Alias: 00/01-06-55-22 W5M
Location Alias 2: 00/01-06-055-22 W5/02
Country: Canada
Province: Alberta
Township: 055
Meridian: 5
Range: 22
Section: 06
County/Municipality: Yellowhead County
Well Name: PETRUS SUNDANCE 8-6-55-22
Operator Name: Petrus Resources Corp.
License Number: 0109782
License Date: 1984-10-10
License Status: Abandoned
Spud Date: 1984-11-06
Final Drill Date: 1997-09-10
Well Total Depth: 4375.00 m
Surface Hole Latitude: 53.719605
Surface Hole Longitude: -117.252124

For data sources see[1][2]

Well History

Date Event
1984-10-10 Obtained License
1984-12-23 Direction Drilling Operation Performed - Deviate
1997-08-20 Direction Drilling Operation Performed - Horizontal
1997-09-10 Finished Drilling
1997-09-10 Perforation Treatment Performed - Open-Hole Completion
1997-09-13 Liner Casing Operation Performed
1997-09-15 Well Log Performed
1997-09-22 Perforation Treatment Performed - Cement Squeeze
1997-09-22 Perforation Treatment Performed - Jet Perforation
1997-09-24 Perforation Treatment Performed - Open-Hole Completion
1997-09-25 Well Log Performed
1997-10-09 Rig Released
1997-10-09 Well Structure changed to Drain
1998-02-14 Perforation Treatment Performed - Cement Squeeze
1998-02-14 Plug Back Performed
1998-02-14 Well Mode changed to Abandoned Zone
2010-09-15 Well Log Performed
2010-10-18 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1984-12-23 2828.00 Deviate (5 - 79 degrees)
1997-08-20 3906.50 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-09-10 Open Hole/Barefoot Completion 3906.50 4375.00 0
1997-09-22 Perforation 3867.50 3868.50 11
1997-09-22 Cement Squeeze 3867.50 3868.50 0
1997-09-24 Open Hole/Barefoot Completion 4111.00 4375.00 0
1998-02-14 Cement Squeeze 4111.00 4375.00 0

For data sources see[5]



References