If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0555231502000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.757608,"lon":-117.325527,"icon":""}]} |
| Location: 00/02-15-055-23W5/0 | |
| Location Alias: 00/02-15-55-23 W5M | |
| Location Alias 2: 00/02-15-055-23 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 055 | |
| Meridian: 5 | |
| Range: 23 | |
| Section: 15 | |
| County/Municipality: Yellowhead County | |
| Well Name: TOURMALINE HZ WILD RIV 2-15-55-23 | |
| Operator Name: Tourmaline Oil Corp. | |
| License Number: 0490345 | |
| License Date: 2018-08-07 | |
| License Status: Issued | |
| Spud Date: 2018-09-21 | |
| Final Drill Date: 2018-10-20 | |
| Well Total Depth: 4069.00 m | |
| Surface Hole Latitude: 53.757608 | |
| Surface Hole Longitude: -117.325527 |
| Date | Event |
|---|---|
| 2018-08-07 | Obtained License |
| 2018-09-22 | Direction Drilling Operation Performed - Deviate |
| 2018-09-22 | Surface Casing Operation Performed |
| 2018-09-22 | Well Log Performed |
| 2018-10-18 | Direction Drilling Operation Performed - Horizontal |
| 2018-10-20 | Finished Drilling |
| 2018-10-20 | Well Log Performed |
| 2018-10-20 | Well Mode changed to Drilled and Cased |
| 2018-10-21 | Well Log Performed |
| 2018-10-22 | Production Casing Operation Performed |
| 2018-10-22 | Rig Released |
| 2018-10-28 | Well Log Performed |
| 2018-11-06 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2018-11-07 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2018-11-14 | Well Began Production |
| 2018-11-14 | Well Fluid changed to Gas |
| 2018-11-14 | Well Mode changed to Flowing |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2018-10-14 | Nabors Drilling Canada Limited | 58 | N/A | Resumption |
| 2018-09-21 | Nabors Drilling Canada Limited | 58 | N/A | Set Surface |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2018-09-22 | 128.30 | Deviate (5 - 79 degrees) |
| 2018-10-18 | 2953.60 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2018-11-06 | Multi-Stage Fracture | 4008.60 | 4008.70 | 0 |
| 2018-11-07 | Multi-Stage Fracture | 3543.50 | 3543.60 | 0 |
| 2018-11-07 | Multi-Stage Fracture | 3490.50 | 3490.60 | 0 |
| 2018-11-07 | Multi-Stage Fracture | 3437.60 | 3437.70 | 0 |
| 2018-11-07 | Multi-Stage Fracture | 3384.60 | 3384.70 | 0 |
| 2018-11-07 | Multi-Stage Fracture | 3331.60 | 3331.70 | 0 |
| 2018-11-07 | Multi-Stage Fracture | 3278.70 | 3278.80 | 0 |
| 2018-11-07 | Multi-Stage Fracture | 3225.70 | 3225.80 | 0 |
| 2018-11-07 | Multi-Stage Fracture | 3173.30 | 3173.40 | 0 |
| 2018-11-07 | Multi-Stage Fracture | 3120.40 | 3120.50 | 0 |
| 2018-11-07 | Multi-Stage Fracture | 3067.50 | 3067.60 | 0 |
| 2018-11-06 | Multi-Stage Fracture | 3966.80 | 3966.90 | 0 |
| 2018-11-07 | Multi-Stage Fracture | 3014.60 | 3014.70 | 0 |
| 2018-11-06 | Multi-Stage Fracture | 3913.90 | 3914.00 | 0 |
| 2018-11-06 | Multi-Stage Fracture | 3861.00 | 3861.10 | 0 |
| 2018-11-06 | Multi-Stage Fracture | 3808.10 | 3808.20 | 0 |
| 2018-11-06 | Multi-Stage Fracture | 3755.10 | 3755.20 | 0 |
| 2018-11-07 | Multi-Stage Fracture | 3702.20 | 3702.30 | 0 |
| 2018-11-07 | Multi-Stage Fracture | 3649.30 | 3649.40 | 0 |
| 2018-11-07 | Multi-Stage Fracture | 3596.40 | 3596.50 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2018-11-06 | 2018-11-07 | 2,868 | 4,586 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | water | Not Available | 100 | 83.4771 | N/A | |||
| Prime Plus 40/70 | Trican | hexamethylenetetramine | 100-97-0 | 100 | 3.619 | N/A | ||
| silica crystalline | 14808-60-7 | 100 | 3.619 | N/A | ||||
| Sand 40/70 | Trican | silica crystalline | 14808-60-7 | 100 | 10.8572 | N/A | ||
| Sand 50/140 | Trican | silica crystalline | 14808-60-7 | 100 | 1.8525 | N/A | ||
| AQUCAR DB20 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0102 | N/A | |
| dibromoacetonitrile | 3252-43-5 | 100 | 0.0102 | N/A | ||||
| non-hazardous ingredients | Not Available | 100 | 0.0102 | N/A | ||||
| polyethylene glycol | 25322-68-3 | 100 | 0.0102 | N/A | ||||
| sodium bromide | 7647-15-6 | 100 | 0.0102 | N/A | ||||
| CC-7 | Trican | Clay Control | 1.6-hexanediamine. dihydrochloride | 6055-52-3 | 100 | 0.0941 | N/A | |
| water | Not Available | 100 | 0.0941 | N/A | ||||
| FR-22 | Trican | Friction Reducer | distillates (petroleum). hydrotreated light naphthenic | 64742-53-6 | 100 | 0.0472 | N/A | |
| non-hazardous ingredients | Not Available | 100 | 0.0472 | N/A | ||||
| S-17X | Trican | Surfactant | 1-hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues |
68609-68-7 | 100 | 0.0422 | N/A | |
| benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol | 26836-07-7 | 100 | 0.0422 | N/A | ||||
| methanol | 67-56-1 | 100 | 0.0422 | N/A | ||||
| methyloxirane polymer with oxirane | 11/6/9003 | 100 | 0.0422 | N/A | ||||
| non-hazardous ingredients | Not Available | 100 | 0.0422 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2018-11-02 | 2018-11-02 | Municipal Water | 90 |
| 2018-11-02 | 2018-11-04 | Recycled Fracturing Water (treated at well site) | 2095 |
| 2018-11-06 | 2018-11-11 | Surface Water - River | 2401 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2018 | 1080 | 0.0 | 0.0 | 0.0 |
| 2019 | 8604 | 0.0 | 0.0 | 0.0 |
| 2020 | 2088 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2018-10-20 | No Incident Encountered | 0.00 | 0.00 |
| 2018-11-26 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]