If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0555242013000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.76035,"lon":-117.538742,"icon":""}]} |
| Location: 00/13-20-055-24W5/0 | |
| Location Alias: 00/13-20-55-24 W5M | |
| Location Alias 2: 00/13-20-055-24 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 055 | |
| Meridian: 5 | |
| Range: 24 | |
| Section: 20 | |
| County/Municipality: Yellowhead County | |
| Well Name: TOURMALINE HZ WILDHAY 13-20-55-24 | |
| Operator Name: Tourmaline Oil Corp. | |
| License Number: 0447062 | |
| License Date: 2012-07-10 | |
| License Status: Issued | |
| Spud Date: 2012-08-13 | |
| Final Drill Date: 2012-09-19 | |
| Well Total Depth: 4224.00 m | |
| Surface Hole Latitude: 53.760350 | |
| Surface Hole Longitude: -117.538742 |
| Date | Event |
|---|---|
| 2012-07-10 | Obtained License |
| 2012-08-13 | Lost Circulation Occurred |
| 2012-08-15 | Surface Casing Operation Performed |
| 2012-08-21 | Intermediate Casing Operation Performed |
| 2012-08-26 | Direction Drilling Operation Performed - Deviate |
| 2012-08-31 | Direction Drilling Operation Performed - Horizontal |
| 2012-09-19 | Finished Drilling |
| 2012-09-19 | Well Mode changed to Drilled and Cased |
| 2012-09-22 | Production Casing Operation Performed |
| 2012-09-23 | Rig Released |
| 2012-09-23 | Well Log Performed |
| 2012-10-09 | Well Log Performed |
| 2012-10-13 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-10-15 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-10-16 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-10-18 | Well Began Production |
| 2012-10-18 | Well Fluid changed to Gas |
| 2012-10-18 | Well Mode changed to Flowing |
| 2013-02-12 | Well Fluid changed to Gas |
| 2013-02-12 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-08-13 | Patterson-UTI Drilling Co. Canada | 14E | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-08-26 | 3001.00 | Deviate (5 - 79 degrees) |
| 2012-08-31 | 3253.40 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-10-13 | Multi-Stage Fracture | 4184.90 | 4186.10 | 0 |
| 2012-10-16 | Multi-Stage Fracture | 3799.90 | 3800.00 | 0 |
| 2012-10-16 | Multi-Stage Fracture | 3757.10 | 3757.20 | 0 |
| 2012-10-16 | Multi-Stage Fracture | 3714.30 | 3714.40 | 0 |
| 2012-10-16 | Multi-Stage Fracture | 3671.40 | 3671.50 | 0 |
| 2012-10-16 | Multi-Stage Fracture | 3628.60 | 3628.70 | 0 |
| 2012-10-16 | Multi-Stage Fracture | 3585.80 | 3585.90 | 0 |
| 2012-10-16 | Multi-Stage Fracture | 3518.20 | 3518.30 | 0 |
| 2012-10-16 | Multi-Stage Fracture | 3437.40 | 3437.50 | 0 |
| 2012-10-16 | Multi-Stage Fracture | 3407.30 | 3407.40 | 0 |
| 2012-10-15 | Multi-Stage Fracture | 4140.70 | 4140.80 | 0 |
| 2012-10-15 | Multi-Stage Fracture | 4098.60 | 4098.70 | 0 |
| 2012-10-15 | Multi-Stage Fracture | 4055.80 | 4055.90 | 0 |
| 2012-10-15 | Multi-Stage Fracture | 4013.20 | 4013.30 | 0 |
| 2012-10-15 | Multi-Stage Fracture | 3970.80 | 3970.90 | 0 |
| 2012-10-15 | Multi-Stage Fracture | 3928.00 | 3928.10 | 0 |
| 2012-10-15 | Multi-Stage Fracture | 3885.30 | 3885.40 | 0 |
| 2012-10-15 | Multi-Stage Fracture | 3842.70 | 3842.80 | 0 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 1492 | 0.0 | 0.0 | 0.0 |
| 2013 | 4421 | 0.0 | 0.0 | 0.0 |
| 2014 | 1610 | 0.0 | 0.0 | 0.0 |
| 2015 | 3003 | 0.0 | 0.0 | 0.0 |
| 2016 | 4189 | 0.0 | 0.0 | 0.0 |
| 2017 | 4416 | 0.0 | 0.0 | 0.0 |
| 2018 | 3937 | 0.0 | 0.0 | 0.0 |
| 2019 | 2429 | 0.0 | 0.0 | 0.0 |
| 2020 | 309 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-08-13 | Lost Circulation | 33.00 | 169.00 |
| 2012-10-27 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]