X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0555242013000

Well Details

Well ID: 0555242013000
Loading map...
Location: 00/13-20-055-24W5/0
Location Alias: 00/13-20-55-24 W5M
Location Alias 2: 00/13-20-055-24 W5/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 5
Range: 24
Section: 20
County/Municipality: Yellowhead County
Well Name: TOURMALINE HZ WILDHAY 13-20-55-24
Operator Name: Tourmaline Oil Corp.
License Number: 0447062
License Date: 2012-07-10
License Status: Issued
Spud Date: 2012-08-13
Final Drill Date: 2012-09-19
Well Total Depth: 4224.00 m
Surface Hole Latitude: 53.760350
Surface Hole Longitude: -117.538742

For data sources see[1][2]

Well History

Date Event
2012-07-10 Obtained License
2012-08-13 Lost Circulation Occurred
2012-08-15 Surface Casing Operation Performed
2012-08-21 Intermediate Casing Operation Performed
2012-08-26 Direction Drilling Operation Performed - Deviate
2012-08-31 Direction Drilling Operation Performed - Horizontal
2012-09-19 Finished Drilling
2012-09-19 Well Mode changed to Drilled and Cased
2012-09-22 Production Casing Operation Performed
2012-09-23 Rig Released
2012-09-23 Well Log Performed
2012-10-09 Well Log Performed
2012-10-13 Perforation Treatment Performed - Multi-Stage Fracture
2012-10-15 Perforation Treatment Performed - Multi-Stage Fracture
2012-10-16 Perforation Treatment Performed - Multi-Stage Fracture
2012-10-18 Well Began Production
2012-10-18 Well Fluid changed to Gas
2012-10-18 Well Mode changed to Flowing
2013-02-12 Well Fluid changed to Gas
2013-02-12 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-08-13 Patterson-UTI Drilling Co. Canada 14E N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-08-26 3001.00 Deviate (5 - 79 degrees)
2012-08-31 3253.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-10-13 Multi-Stage Fracture 4184.90 4186.10 0
2012-10-16 Multi-Stage Fracture 3799.90 3800.00 0
2012-10-16 Multi-Stage Fracture 3757.10 3757.20 0
2012-10-16 Multi-Stage Fracture 3714.30 3714.40 0
2012-10-16 Multi-Stage Fracture 3671.40 3671.50 0
2012-10-16 Multi-Stage Fracture 3628.60 3628.70 0
2012-10-16 Multi-Stage Fracture 3585.80 3585.90 0
2012-10-16 Multi-Stage Fracture 3518.20 3518.30 0
2012-10-16 Multi-Stage Fracture 3437.40 3437.50 0
2012-10-16 Multi-Stage Fracture 3407.30 3407.40 0
2012-10-15 Multi-Stage Fracture 4140.70 4140.80 0
2012-10-15 Multi-Stage Fracture 4098.60 4098.70 0
2012-10-15 Multi-Stage Fracture 4055.80 4055.90 0
2012-10-15 Multi-Stage Fracture 4013.20 4013.30 0
2012-10-15 Multi-Stage Fracture 3970.80 3970.90 0
2012-10-15 Multi-Stage Fracture 3928.00 3928.10 0
2012-10-15 Multi-Stage Fracture 3885.30 3885.40 0
2012-10-15 Multi-Stage Fracture 3842.70 3842.80 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 1492 0.0 0.0 0.0
2013 4421 0.0 0.0 0.0
2014 1610 0.0 0.0 0.0
2015 3003 0.0 0.0 0.0
2016 4189 0.0 0.0 0.0
2017 4416 0.0 0.0 0.0
2018 3937 0.0 0.0 0.0
2019 2429 0.0 0.0 0.0
2020 309 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-13 Lost Circulation 33.00 169.00
2012-10-27 No Incident Encountered 0.00 0.00

For data sources see[8]

References