X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0555242014000

Well Details

Well ID: 0555242014000
Loading map...
Location: 00/14-20-055-24W5/0
Location Alias: 00/14-20-55-24 W5M
Location Alias 2: 00/14-20-055-24 W5/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 5
Range: 24
Section: 20
County/Municipality: Yellowhead County
Well Name: TOURMALINE HZ WILDHAY 14-20-55-24
Operator Name: Tourmaline Oil Corp.
License Number: 0479102
License Date: 2016-03-01
License Status: Issued
Spud Date: 2016-07-25
Final Drill Date: 2016-08-15
Well Total Depth: 4407.00 m
Surface Hole Latitude: 53.762135
Surface Hole Longitude: -117.524170

For data sources see[1][2]

Well History

Date Event
2016-03-01 Obtained License
2016-07-26 Surface Casing Operation Performed
2016-08-04 Direction Drilling Operation Performed - Deviate
2016-08-06 Direction Drilling Operation Performed - Horizontal
2016-08-06 Well Log Performed
2016-08-11 Intermediate Casing Operation Performed
2016-08-15 Finished Drilling
2016-08-15 Well Log Performed
2016-08-15 Well Mode changed to Drilled and Cased
2016-08-16 Well Log Performed
2016-08-18 Liner Casing Operation Performed
2016-08-19 Rig Released
2016-08-26 Perforation Treatment Performed - Multi-Stage Fracture
2016-08-26 Well Log Performed
2016-08-27 Perforation Treatment Performed - Multi-Stage Fracture
2016-08-28 Perforation Treatment Performed - Multi-Stage Fracture
2016-08-29 Well Fluid changed to Gas
2016-08-29 Well Mode changed to Testing
2016-09-01 Well Began Production
2016-09-01 Well Fluid changed to Gas
2016-09-01 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-07-25 Nabors Drilling Limited 77 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-08-04 2608.40 Deviate (5 - 79 degrees)
2016-08-06 3175.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-08-26 Multi-Stage Fracture 4348.20 4348.30 0
2016-08-27 Multi-Stage Fracture 3883.00 3883.10 0
2016-08-27 Multi-Stage Fracture 3830.10 3830.20 0
2016-08-27 Multi-Stage Fracture 3777.10 3777.20 0
2016-08-27 Multi-Stage Fracture 3724.80 3724.90 0
2016-08-27 Multi-Stage Fracture 3671.90 3672.00 0
2016-08-27 Multi-Stage Fracture 3619.00 3619.10 0
2016-08-28 Multi-Stage Fracture 3566.20 3566.30 0
2016-08-28 Multi-Stage Fracture 3513.30 3513.40 0
2016-08-28 Multi-Stage Fracture 3460.40 3460.50 0
2016-08-28 Multi-Stage Fracture 3407.50 3407.60 0
2016-08-27 Multi-Stage Fracture 4306.30 4306.40 0
2016-08-28 Multi-Stage Fracture 3354.60 3354.70 0
2016-08-28 Multi-Stage Fracture 3301.60 3301.70 0
2016-08-28 Multi-Stage Fracture 3261.50 3261.60 0
2016-08-27 Multi-Stage Fracture 4253.40 4253.50 0
2016-08-27 Multi-Stage Fracture 4200.50 4200.60 0
2016-08-27 Multi-Stage Fracture 4147.60 4147.70 0
2016-08-27 Multi-Stage Fracture 4094.70 4094.80 0
2016-08-27 Multi-Stage Fracture 4041.80 4041.90 0
2016-08-27 Multi-Stage Fracture 3988.90 3989.00 0
2016-08-27 Multi-Stage Fracture 3935.90 3936.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-08-26 2016-08-28 3,007 5,684 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 84.8698 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 3.7092 N/A
silica crystalline 14808-60-7 100 3.7092 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 9.3794 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.8226 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0111 N/A
2-mercaptoethanol 60-24-2 100 0.0111 N/A
dibromoacetonitrile 3252-43-5 100 0.0111 N/A
non-hazardous ingredients Not Available 100 0.0111 N/A
sodium bromide 7647-15-6 100 0.0111 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0918 N/A
water Not Available 100 0.0918 N/A
FR-9 Trican Friction Reducer alcohols. C10-16. ethoxylated 68002-97-1 100 0.0741 N/A
alcohols. C12-14. ethoxylated 68439-50-9 100 0.0741 N/A
alcohols. C12-16. ethoxylated 68551-12-2 100 0.0741 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0741 N/A
non-hazardous ingredients Not Available 100 0.0741 N/A
S-17W Trican Surfactant ethylene/propylene oxide polymer Not Available 100 0.0415 N/A
methanol 67-56-1 100 0.0415 N/A
water Not Available 100 0.0415 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-08-23 2016-08-28 Groundwater - Non-saline less than or equal to 150m deep 5403
2016-08-27 2016-08-28 Recycled Fracturing Water (treated at well site) 281

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 2999 0.0 0.0 0.0
2017 8701 0.0 0.0 0.0
2018 8754 0.0 0.0 0.0
2019 8743 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-08-15 No Incident Encountered 0.00 0.00
2016-09-06 No Incident Encountered 0.00 0.00

For data sources see[10]

References