X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564031310003

Well Details

Well ID: 0564031310003
Loading map...
Location: 00/10-13-056-03W4/3
Location Alias: 00/10-13-56-03 W4M
Location Alias 2: 00/10-13-056-03 W4/03
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 03
Section: 13
County/Municipality: Unipouheos 121
Well Name: CNRES FROG LAKE 10-13-56-3
Operator Name: Canadian Natural Resources Limited
License Number: 0188776
License Date: 1996-06-18
License Status: Abandoned
Spud Date: 1996-06-24
Final Drill Date: 1996-06-26
Well Total Depth: 500.00 m
Surface Hole Latitude: 53.841408
Surface Hole Longitude: -110.313208

For data sources see[1][2]

Well History

Date Event
1996-06-18 Obtained License
1996-06-24 Well Log Performed
1996-06-25 Surface Casing Operation Performed
1996-06-26 Finished Drilling
1996-06-26 Well Log Performed
1996-06-26 Well Mode changed to Drilled and Cased
1996-06-27 Production Casing Operation Performed
1996-06-27 Rig Released
1996-07-03 Well Log Performed
1996-07-04 Perforation Treatment Performed - Jet Perforation
1996-11-01 Perforation Treatment Performed - Jet Perforation
2001-05-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-05-12 Perforation Treatment Performed - Jet Perforation
2001-05-12 Plug Back Performed
2001-05-12 Well Log Performed
2001-05-14 Perforation Treatment Performed - Jet Perforation
2002-05-31 Well Began Production
2002-05-31 Well Fluid changed to Gas
2002-05-31 Well Mode changed to Flowing
2012-02-29 Well Fluid changed to Gas
2012-02-29 Well Mode changed to Suspended
2013-03-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-03-26 Perforation Treatment Performed - Cement Plug
2013-03-26 Plug Back Performed
2013-03-26 Well Fluid changed to Gas
2013-03-26 Well Mode changed to Abandoned Zone
2013-04-05 Well Abandoned
2013-04-05 Well Fluid changed to Gas
2013-04-05 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-07-04 Perforation 433.00 437.00 39
2013-03-26 Packing Device Capped w/Cement 363.50 371.50 0
2013-03-26 Packing Device Capped w/Cement 345.00 360.00 0
1996-11-01 Perforation 416.00 418.00 39
1996-11-01 Perforation 425.00 426.00 39
2001-05-12 Packing Device Capped w/Cement 403.00 411.00 0
2001-05-12 Perforation 373.00 374.00 17
2001-05-12 Perforation 374.50 375.50 17
2001-05-12 Perforation 376.50 377.50 17
2001-05-14 Perforation 367.50 368.20 17
2013-03-26 Cement Plug 377.00 403.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 5043 0.0 0.0 0.0
2003 8544 0.0 0.0 0.0
2004 8717 0.0 0.0 0.0
2005 8435 0.0 0.0 0.0
2006 8523 0.0 0.0 0.0
2007 8546 0.0 0.0 0.0
2008 8477 0.0 0.0 0.0
2009 8615 0.0 0.0 0.0
2010 8499 0.0 0.0 0.0
2011 736 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-04-05 No Incident Encountered 0.00 0.00

For data sources see[6]

References