X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564031507000

Well Details

Well ID: 0564031507000
Loading map...
Location: 00/07-15-056-03W4/0
Location Alias: 00/07-15-56-03 W4M
Location Alias 2: 00/07-15-056-03 W4/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 03
Section: 15
County/Municipality: Unipouheos 121
Well Name: GEAR LIND 7-15-56-3
Operator Name: Gear Energy Ltd.
License Number: 0122618
License Date: 1986-02-21
License Status: Suspension
Spud Date: 1986-02-28
Final Drill Date: 1986-03-02
Well Total Depth: 514.00 m
Surface Hole Latitude: 53.836065
Surface Hole Longitude: -110.362775

For data sources see[1][2]

Well History

Date Event
1986-02-21 Obtained License
1986-03-01 Surface Casing Operation Performed
1986-03-02 Finished Drilling
1986-03-02 Production Casing Operation Performed
1986-03-02 Rig Released
1986-03-02 Well Log Performed
1986-03-02 Well Mode changed to Drilled and Cased
1986-03-06 Perforation Treatment Performed - Jet Perforation
1986-04-01 Well Began Production
1986-04-01 Well Fluid changed to Crude Bitumen
1986-04-01 Well Mode changed to Pumping
1988-07-06 Perforation Treatment Performed - Jet Perforation
1989-02-02 Well Fluid changed to Crude Bitumen
1989-02-02 Well Mode changed to Suspended
1989-04-22 Well Fluid changed to Crude Bitumen
1989-04-22 Well Mode changed to Pumping
1989-07-20 Well Fluid changed to Crude Bitumen
1989-07-20 Well Mode changed to Suspended
1989-11-19 Well Fluid changed to Crude Bitumen
1989-11-19 Well Mode changed to Pumping
1990-05-26 Well Fluid changed to Crude Bitumen
1990-05-26 Well Mode changed to Suspended
1990-08-12 Well Fluid changed to Crude Bitumen
1990-08-12 Well Mode changed to Pumping
1990-10-02 Well Fluid changed to Crude Bitumen
1990-10-02 Well Mode changed to Suspended
1994-10-26 Well Fluid changed to Crude Bitumen
1994-10-26 Well Mode changed to Pumping
2000-08-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-08-15 Plug Back Performed
2000-08-15 Well Fluid changed to Crude Bitumen
2000-08-15 Well Mode changed to Abandoned Zone
2012-06-24 Well Log Performed
2019-11-13 Perforation Treatment Performed - Jet Perforation
2019-11-13 Well Log Performed
2019-11-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-11-14 Perforation Treatment Performed - Cement Plug
2019-11-14 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-03-06 Perforation 435.00 438.00 13
1988-07-06 Perforation 427.50 430.00 13
2000-08-15 Packing Device Capped w/Cement 456.00 464.00 0
2000-08-15 Packing Device Capped w/Cement 360.00 420.00 0
2019-11-13 Perforation 245.00 247.00 20
2019-11-14 Cement Plug 243.00 360.00 0
2019-11-14 Packing Device Capped w/Cement 235.00 243.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 1868 0.0 0.0 0.0
1987 8557 0.0 0.0 0.0
1988 8107 0.0 0.0 0.0
1989 2198 0.0 0.0 0.0
1990 4107 0.0 0.0 0.0
1994 120 0.0 0.0 0.0
1995 1128 0.0 0.0 0.0
1996 1416 0.0 0.0 0.0
1997 1 0.0 0.0 0.0
1999 2096 0.0 0.0 0.0
2000 1548 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-11-14 No Incident Encountered 0.00 0.00

For data sources see[6]

References