X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564031711000

Well Details

Well ID: 0564031711000
Loading map...
Location: 00/11-17-056-03W4/0
Location Alias: 00/11-17-56-03 W4M
Location Alias 2: 00/11-17-056-03 W4/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 03
Section: 17
County/Municipality: Unipouheos 121
Well Name: WLEC LIND 11-17-56-3
Operator Name: West Lake Energy Corp.
License Number: 0103131
License Date: 1983-09-16
License Status: Issued
Spud Date: 1983-10-02
Final Drill Date: 1983-10-04
Well Total Depth: 534.00 m
Surface Hole Latitude: 53.842012
Surface Hole Longitude: -110.414501

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-09-16 Obtained License
1983-10-04 Finished Drilling
1983-10-05 Production Casing Operation Performed
1983-10-06 Well Mode changed to Drilled and Cased
1985-03-04 Perforation Treatment Performed - Jet Perforation
1985-03-04 Well Log Performed
1985-03-08 Well Began Production
1985-03-08 Well Fluid changed to Crude Bitumen
1985-03-08 Well Mode changed to Pumping
1986-01-13 Perforation Treatment Performed - Jet Perforation
1988-09-28 Well Fluid changed to Crude Bitumen
1988-09-28 Well Mode changed to Suspended
1990-09-10 Well Fluid changed to Crude Bitumen
1990-09-10 Well Mode changed to Pumping
1991-10-01 Well Fluid changed to Crude Bitumen
1991-10-01 Well Mode changed to Suspended
1994-11-11 Well Fluid changed to Crude Bitumen
1994-11-11 Well Mode changed to Pumping
2001-08-27 Perforation Treatment Performed - Jet Perforation
2006-08-25 Perforation Treatment Performed - Cement Plug
2006-08-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-08-28 Plug Back Performed
2006-08-28 Well Fluid changed to Crude Bitumen
2006-08-28 Well Mode changed to Abandoned Zone
2006-08-29 Perforation Treatment Performed - Jet Perforation
2006-09-01 Well Fluid changed to Crude Bitumen
2006-09-01 Well Mode changed to Suspended
2008-09-23 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-03-04 Perforation 455.80 458.80 13
1986-01-13 Perforation 450.30 452.80 13
2001-08-27 Perforation 445.50 448.00 26
2006-08-25 Cement Plug 460.00 531.50 0
2006-08-28 Packing Device Capped w/Cement 433.00 441.50 0
2006-08-29 Perforation 358.50 359.50 13
2008-09-23 Fracture 358.50 359.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 6703 0.0 0.0 0.0
1986 5652 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 2472 0.0 0.0 0.0
1991 1424 0.0 0.0 0.0
1994 1224 0.0 0.0 0.0
1995 7107 0.0 0.0 0.0
1996 8208 0.0 0.0 0.0
1997 7365 0.0 0.0 0.0
1998 8380 0.0 0.0 0.0
1999 8334 0.0 0.0 0.0
2000 8188 0.0 0.0 0.0
2001 3477 0.0 0.0 0.0
2002 3403 0.0 0.0 0.0
2004 0 0.0 0.0 0.0

For data sources see[5]

References