X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564032011002

Well Details

Well ID: 0564032011002
Loading map...
Location: 00/11-20-056-03W4/2
Location Alias: 00/11-20-56-03 W4M
Location Alias 2: 00/11-20-056-03 W4/02
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 03
Section: 20
County/Municipality: Unipouheos 121
Well Name: WLEC 11B FROG LK 11-20-56-3
Operator Name: West Lake Energy Corp.
License Number: 0423086
License Date: 2010-08-31
License Status: Suspension
Spud Date: 2010-09-08
Final Drill Date: 2010-09-11
Well Total Depth: 588.50 m
Surface Hole Latitude: 53.853479
Surface Hole Longitude: -110.414160

For data sources see[1][2]

Well History

Date Event
2010-08-31 Obtained License
2010-09-09 Surface Casing Operation Performed
2010-09-10 Direction Drilling Operation Performed - Deviate
2010-09-11 Finished Drilling
2010-09-11 Well Mode changed to Drilled and Cased
2010-09-12 Production Casing Operation Performed
2010-09-12 Rig Released
2010-09-12 Well Log Performed
2010-10-05 Perforation Treatment Performed - Cement Plug
2010-10-05 Perforation Treatment Performed - Jet Perforation
2010-10-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-10-15 Plug Back Performed
2010-10-16 Perforation Treatment Performed - Jet Perforation
2010-10-16 Well Began Production
2010-10-16 Well Fluid changed to Crude Bitumen
2010-10-16 Well Mode changed to Pumping
2011-10-26 Perforation Treatment Performed - Jet Perforation
2011-10-26 Well Log Performed
2017-06-01 Well Fluid changed to Crude Bitumen
2017-06-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-09-10 120.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-10-05 Cement Plug 569.20 572.20 0
2010-10-05 Perforation 537.50 539.50 26
2010-10-15 Packing Device Capped w/Cement 526.80 534.80 0
2010-10-16 Perforation 513.50 515.50 26
2011-10-26 Perforation 507.00 508.00 26
2011-10-26 Perforation 504.00 505.50 26
2011-10-26 Perforation 494.50 496.50 26

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 2208 0.0 0.0 0.0
2011 8447 0.0 0.0 0.0
2012 8736 0.0 0.0 0.0
2013 8735 0.0 0.0 0.0
2014 8640 0.0 0.0 0.0
2015 8181 0.0 0.0 0.0
2016 2951 0.0 0.0 0.0

For data sources see[6]

References