X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564032103000

Well Details

Well ID: 0564032103000
Loading map...
Location: 00/03-21-056-03W4/0
Location Alias: 00/03-21-56-03 W4M
Location Alias 2: 00/03-21-056-03 W4/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 03
Section: 21
County/Municipality: Unipouheos 121
Well Name: WLEC LIND 3-21-56-3
Operator Name: West Lake Energy Corp.
License Number: 0118810
License Date: 1985-10-31
License Status: Abandoned
Spud Date: 1985-12-19
Final Drill Date: 1985-12-20
Well Total Depth: 467.00 m
Surface Hole Latitude: 53.848181
Surface Hole Longitude: -110.394615

For data sources see[1][2]

Well History

Date Event
1985-10-31 Obtained License
1985-12-19 Surface Casing Operation Performed
1985-12-20 Finished Drilling
1985-12-20 Well Mode changed to Drilled and Cased
1985-12-21 Production Casing Operation Performed
1985-12-21 Rig Released
1985-12-21 Well Log Performed
1985-12-31 Well Log Performed
1986-01-10 Perforation Treatment Performed - Jet Perforation
1986-01-16 Well Began Production
1986-01-16 Well Fluid changed to Crude Bitumen
1986-01-16 Well Mode changed to Pumping
1995-11-08 Perforation Treatment Performed - Jet Perforation
2000-09-30 Well Fluid changed to Crude Bitumen
2000-09-30 Well Mode changed to Suspended
2002-04-02 Well Fluid changed to Crude Bitumen
2002-04-02 Well Mode changed to Pumping
2002-09-24 Perforation Treatment Performed - Jet Perforation
2002-12-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-12-10 Plug Back Performed
2002-12-10 Well Fluid changed to Crude Bitumen
2002-12-10 Well Mode changed to Abandoned Zone
2018-08-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-08-29 Plug Back Performed
2018-11-08 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-01-10 Perforation 437.00 442.00 13
1995-11-08 Perforation 427.00 430.00 26
1995-11-08 Perforation 432.00 434.00 26
2002-09-24 Perforation 397.00 398.50 26
2002-12-10 Packing Device Capped w/Cement 415.00 423.00 0
2018-08-29 Packing Device Capped w/Cement 384.00 392.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 5636 0.0 0.0 0.0
1987 6632 0.0 0.0 0.0
1988 7464 0.0 0.0 0.0
1989 8681 0.0 0.0 0.0
1990 8711 0.0 0.0 0.0
1991 8719 0.0 0.0 0.0
1992 7868 0.0 0.0 0.0
1993 8685 0.0 0.0 0.0
1994 8683 0.0 0.0 0.0
1995 8695 0.0 0.0 0.0
1996 7837 0.0 0.0 0.0
1997 7955 0.0 0.0 0.0
1998 8340 0.0 0.0 0.0
1999 7821 0.0 0.0 0.0
2002 6258 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-08-29 No Incident Encountered 0.00 0.00

For data sources see[6]

References