If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0564032302000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.849099,"lon":-110.338457,"icon":""}]} |
Location: 00/02-23-056-03W4/0 | |
Location Alias: 00/02-23-56-03 W4M | |
Location Alias 2: 00/02-23-056-03 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 056 | |
Meridian: 4 | |
Range: 03 | |
Section: 23 | |
County/Municipality: Unipouheos 121 | |
Well Name: WLEC LIND 2-23-56-3 | |
Operator Name: West Lake Energy Corp. | |
License Number: 0118987 | |
License Date: 1985-11-06 | |
License Status: Abandoned | |
Spud Date: 1985-11-10 | |
Final Drill Date: 1985-11-13 | |
Well Total Depth: 491.00 m | |
Surface Hole Latitude: 53.849099 | |
Surface Hole Longitude: -110.338457 |
Date | Event |
---|---|
1985-11-06 | Obtained License |
1985-11-11 | Surface Casing Operation Performed |
1985-11-13 | Finished Drilling |
1985-11-13 | Well Log Performed |
1985-11-13 | Well Mode changed to Drilled and Cased |
1985-11-14 | Drill Stem Test Performed |
1985-11-14 | Production Casing Operation Performed |
1985-11-15 | Rig Released |
1985-11-20 | Well Log Performed |
1985-11-29 | Perforation Treatment Performed - Jet Perforation |
1985-12-24 | Well Began Production |
1985-12-24 | Well Fluid changed to Crude Bitumen |
1985-12-24 | Well Mode changed to Pumping |
1988-09-28 | Well Fluid changed to Crude Bitumen |
1988-09-28 | Well Mode changed to Suspended |
1989-09-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1989-09-14 | Perforation Treatment Performed - Jet Perforation |
1989-09-14 | Plug Back Performed |
1989-09-14 | Well Fluid changed to Crude Bitumen |
1989-09-14 | Well Mode changed to Abandoned Zone |
2008-09-10 | Perforation Treatment Performed - Cement Plug |
2008-09-10 | Plug Back Performed |
2008-09-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-09-11 | Plug Back Performed |
2008-09-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-09-12 | Plug Back Performed |
2008-09-20 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1985-11-29 | Perforation | 441.00 | 444.00 | 13 |
1989-09-14 | Packing Device Capped w/Cement | 422.00 | 430.00 | 0 |
1989-09-14 | Perforation | 379.00 | 381.50 | 13 |
1989-09-14 | Perforation | 383.00 | 383.50 | 13 |
1989-09-14 | Perforation | 401.00 | 401.70 | 13 |
2008-09-10 | Cement Plug | 402.00 | 422.00 | 0 |
2008-09-11 | Packing Device Capped w/Cement | 383.50 | 397.00 | 0 |
2008-09-12 | Packing Device Capped w/Cement | 359.50 | 369.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1986 | 0 | 0.0 | 0.0 | 0.0 |
1987 | 648 | 0.0 | 0.0 | 0.0 |
1989 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]