X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564032902020

Well Details

Well ID: 0564032902020
Loading map...
Location: 02/02-29-056-03W4/0
Location Alias: 02/02-29-56-03 W4M
Location Alias 2: 02/02-29-056-03 W4/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 03
Section: 29
County/Municipality: Unipouheos 121
Well Name: WLEC 2B FROG LK 2-29-56-3
Operator Name: West Lake Energy Corp.
License Number: 0412576
License Date: 2009-09-24
License Status: Suspension
Spud Date: 2009-11-02
Final Drill Date: 2009-11-05
Well Total Depth: 584.00 m
Surface Hole Latitude: 53.861469
Surface Hole Longitude: -110.414199

For data sources see[1][2]

Well History

Date Event
2009-09-24 Obtained License
2009-11-03 Direction Drilling Operation Performed - Deviate
2009-11-03 Surface Casing Operation Performed
2009-11-04 Production Casing Operation Performed
2009-11-05 Finished Drilling
2009-11-05 Rig Released
2009-11-05 Well Log Performed
2009-11-05 Well Mode changed to Drilled and Cased
2009-11-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-11-21 Perforation Treatment Performed - Jet Perforation
2009-11-21 Well Began Production
2009-11-21 Well Fluid changed to Crude Bitumen
2009-11-21 Well Mode changed to Pumping
2016-04-01 Well Fluid changed to Crude Bitumen
2016-04-01 Well Mode changed to Suspended
2018-04-05 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2018-04-05 Plug Back Performed
2018-04-05 Well Fluid changed to Crude Bitumen
2018-04-05 Well Mode changed to Abandoned Zone
2018-04-06 Perforation Treatment Performed - Jet Perforation
2018-04-06 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-11-03 125.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-11-21 Packing Device Capped w/Cement 567.00 570.00 0
2009-11-21 Perforation 514.50 517.50 26
2009-11-21 Perforation 505.50 507.50 26
2018-04-05 Packing Dev Cpd w/Res-Gyp Cem 500.00 503.00 0
2018-04-06 Perforation 490.00 493.00 26
2018-04-06 Perforation 484.00 486.00 26

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 744 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 6115 0.0 0.0 0.0
2015 743 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-04-05 No Incident Encountered 0.00 0.00
2018-04-06 No Incident Encountered 0.00 0.00

For data sources see[7]

References