If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0564033008000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.86598,"lon":-110.431144,"icon":""}]} |
Location: 00/08-30-056-03W4/0 | |
Location Alias: 00/08-30-56-03 W4M | |
Location Alias 2: 00/08-30-056-03 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 056 | |
Meridian: 4 | |
Range: 03 | |
Section: 30 | |
County/Municipality: Unipouheos 121 | |
Well Name: WINDTALKER 8A FROG LK 8-30-56-3 | |
Operator Name: Windtalker Energy Corp. | |
License Number: 0435455 | |
License Date: 2011-07-26 | |
License Status: Issued | |
Spud Date: 2011-08-12 | |
Final Drill Date: 2011-08-14 | |
Well Total Depth: 612.00 m | |
Surface Hole Latitude: 53.865980 | |
Surface Hole Longitude: -110.431144 |
Date | Event |
---|---|
2011-07-26 | Obtained License |
2011-08-12 | Surface Casing Operation Performed |
2011-08-13 | Direction Drilling Operation Performed - Deviate |
2011-08-14 | Finished Drilling |
2011-08-14 | Production Casing Operation Performed |
2011-08-14 | Well Log Performed |
2011-08-14 | Well Mode changed to Drilled and Cased |
2011-08-15 | Rig Released |
2011-09-02 | Perforation Treatment Performed - Jet Perforation |
2011-09-12 | Well Began Production |
2011-09-12 | Well Fluid changed to Crude Bitumen |
2011-09-12 | Well Mode changed to Pumping |
2013-11-30 | Perforation Treatment Performed - Jet Perforation |
2015-02-01 | Well Fluid changed to Crude Bitumen |
2015-02-01 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-08-13 | 116.60 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-09-02 | Perforation | 525.50 | 527.50 | 26 |
2013-11-30 | Perforation | 525.50 | 529.00 | 26 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 2442 | 0.0 | 0.0 | 0.0 |
2012 | 6703 | 0.0 | 0.0 | 0.0 |
2013 | 586 | 0.0 | 0.0 | 0.0 |
2014 | 6642 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-11-30 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]