If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0564051913002 | |
Location: 00/13-19-056-05W4/2 | |
Location Alias: 00/13-19-56-05 W4M | |
Location Alias 2: 00/13-19-056-05 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 056 | |
Meridian: 4 | |
Range: 05 | |
Section: 19 | |
County/Municipality: County of St. Paul No. 19 | |
Well Name: GEAR LIND 13-19-56-5 | |
Operator Name: Gear Energy Ltd. | |
License Number: 0236545 | |
License Date: 2000-04-27 | |
License Status: Suspension | |
Spud Date: 2000-04-27 | |
Final Drill Date: 2000-04-28 | |
Well Total Depth: 471.00 m | |
Surface Hole Latitude: 53.858571 | |
Surface Hole Longitude: -110.744098 |
Date | Event |
---|---|
2000-04-27 | Obtained License |
2000-04-27 | Surface Casing Operation Performed |
2000-04-28 | Direction Drilling Operation Performed - Deviate |
2000-04-28 | Finished Drilling |
2000-04-28 | Well Mode changed to Drilled and Cased |
2000-04-29 | Production Casing Operation Performed |
2000-04-29 | Rig Released |
2000-04-29 | Well Log Performed |
2000-05-02 | Perforation Treatment Performed - Jet Perforation |
2003-01-24 | Perforation Treatment Performed - Jet Perforation |
2003-01-24 | Well Log Performed |
2004-05-27 | Well Began Production |
2004-05-27 | Well Fluid changed to Crude Bitumen |
2004-05-27 | Well Mode changed to Pumping |
2004-05-29 | Perforation Treatment Performed - Jet Perforation |
2004-05-29 | Well Log Performed |
2008-09-01 | Well Fluid changed to Crude Bitumen |
2008-09-01 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2000-04-28 | 89.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2000-05-02 | Perforation | 424.00 | 428.00 | 26 |
2003-01-24 | Perforation | 423.50 | 424.00 | 26 |
2003-01-24 | Perforation | 416.30 | 419.00 | 26 |
2003-01-24 | Perforation | 412.20 | 415.00 | 26 |
2004-05-29 | Perforation | 400.00 | 402.50 | 26 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2004 | 2735 | 0.0 | 0.0 | 0.0 |
2005 | 1220 | 0.0 | 0.0 | 0.0 |
For data sources see[6]