X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564052316040

Well Details

Well ID: 0564052316040
Loading map...
Location: 04/16-23-056-05W4/0
Location Alias: 04/16-23-56-05 W4M
Location Alias 2: 04/16-23-056-05 W4/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 05
Section: 23
County/Municipality: County of St. Paul No. 19
Well Name: CCS LIND 16-23-56-5
Operator Name: Tervita Corporation
License Number: 0313685
License Date: 2004-08-20
License Status: Amended
Spud Date: 2004-09-12
Final Drill Date: 2004-10-24
Well Total Depth: 1822.00 m
Surface Hole Latitude: 53.865901
Surface Hole Longitude: -110.641825

For data sources see[1][2]

Well History

Date Event
2004-08-20 Obtained License
2004-09-20 Lost Circulation Occurred
2004-09-21 Direction Drilling Operation Performed - Deviate
2004-09-28 Lost Circulation Occurred
2004-10-14 Well Log Performed
2004-10-19 Surface Casing Operation Performed
2004-10-22 Intermediate Casing Operation Performed
2004-10-23 Production Casing Operation Performed
2004-10-24 Finished Drilling
2004-10-26 Well Log Performed
2004-11-01 Lost Circulation Occurred
2004-11-03 Well Mode changed to Drilled and Cased
2004-11-06 Perforation Treatment Performed - Open-Hole Completion
2004-11-06 Rig Released
2005-03-03 Well Began Injection
2005-03-03 Well Fluid changed to Waste
2005-03-03 Well Type changed to Disposal
2005-05-12 Well Log Performed
2005-05-13 Perforation Treatment Performed - Jet Perforation
2005-05-13 Well Log Performed
2005-05-15 Perforation Treatment Performed - Cement Squeeze
2005-05-15 Perforation Treatment Performed - Jet Perforation
2005-05-15 Well Log Performed
2005-05-20 Perforation Treatment Performed - Cement Squeeze
2009-03-01 Well Fluid changed to Waste
2009-03-01 Well Type changed to Cavern

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2004-09-21 241.70 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-11-06 Open Hole/Barefoot Completion 1806.20 1822.00 0
2005-05-13 Perforation 290.00 291.00 14
2005-05-15 Cement Squeeze 290.00 291.00 0
2005-05-15 Perforation 192.00 193.00 14
2005-05-20 Cement Squeeze 192.00 193.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2004-09-20 Lost Circulation 276.00 276.00
2004-09-28 Lost Circulation 990.00 990.00
2004-11-01 Lost Circulation 1787.50 1791.50

For data sources see[7]

References