X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564053002000

Well Details

Well ID: 0564053002000
Loading map...
Location: 00/02-30-056-05W4/0
Location Alias: 00/02-30-56-05 W4M
Location Alias 2: 00/02-30-056-05 W4/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 05
Section: 30
County/Municipality: County of St. Paul No. 19
Well Name: GEAR LIND 2-30-56-5
Operator Name: Gear Energy Ltd.
License Number: 0203571
License Date: 1997-07-17
License Status: Suspension
Spud Date: 1997-07-26
Final Drill Date: 1997-07-28
Well Total Depth: 532.00 m
Surface Hole Latitude: 53.859588
Surface Hole Longitude: -110.732316

For data sources see[1][2]

Well History

Date Event
1997-07-17 Obtained License
1997-07-26 Direction Drilling Operation Performed - Deviate
1997-07-27 Surface Casing Operation Performed
1997-07-28 Finished Drilling
1997-07-28 Well Log Performed
1997-07-28 Well Mode changed to Drilled and Cased
1997-07-29 Production Casing Operation Performed
1997-07-29 Rig Released
1997-08-23 Perforation Treatment Performed - Jet Perforation
1997-09-13 Well Began Production
1997-09-13 Well Fluid changed to Crude Bitumen
1997-09-13 Well Mode changed to Pumping
1997-10-14 Well Log Performed
1998-05-15 Well Fluid changed to Crude Bitumen
1998-05-15 Well Mode changed to Suspended
1998-09-01 Well Fluid changed to Crude Bitumen
1998-09-01 Well Mode changed to Pumping
2000-06-09 Perforation Treatment Performed - Jet Perforation
2000-06-09 Well Fluid changed to Crude Bitumen
2000-06-09 Well Mode changed to Pumping
2002-02-23 Perforation Treatment Performed - Casing Patch (Over Perfs)
2007-08-12 Perforation Treatment Performed - Jet Perforation
2007-08-12 Well Log Performed
2011-04-01 Well Fluid changed to Crude Bitumen
2011-04-01 Well Mode changed to Suspended
2019-09-19 Perforation Treatment Performed - Cement Plug
2019-09-19 Plug Back Performed
2019-09-20 Perforation Treatment Performed - Cement Plug
2019-09-20 Plug Back Performed
2019-09-25 Perforation Treatment Performed - Cement Plug
2019-09-25 Plug Back Performed
2019-09-25 Well Fluid changed to Crude Bitumen
2019-09-25 Well Mode changed to Abandoned Zone
2019-10-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-10-07 Plug Back Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-07-26 22.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-08-23 Perforation 449.00 455.00 26
2019-09-25 Cement Plug 398.00 435.00 0
2019-10-07 Packing Device Capped w/Cement 365.00 378.50 0
1997-08-23 Perforation 442.00 444.50 26
1997-08-23 Perforation 437.00 440.00 26
2000-06-09 Perforation 385.00 387.00 26
2002-02-23 Casing Patch 385.00 387.00 0
2007-08-12 Perforation 422.00 424.00 20
2007-08-12 Perforation 426.00 427.00 20
2019-09-19 Cement Plug 449.70 518.00 0
2019-09-20 Cement Plug 445.20 449.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 2633 0.0 0.0 0.0
1998 2960 0.0 0.0 0.0
1999 744 0.0 0.0 0.0
2000 3518 0.0 0.0 0.0
2002 120 0.0 0.0 0.0
2007 2154 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-09-25 No Incident Encountered 0.00 0.00
2019-10-07 No Incident Encountered 0.00 0.00

For data sources see[7]

References