If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0564181015000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.831804,"lon":-112.58935,"icon":""}]} |
Location: 00/15-10-056-18W4/0 | |
Location Alias: 00/15-10-56-18 W4M | |
Location Alias 2: 00/15-10-056-18 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 056 | |
Meridian: 4 | |
Range: 18 | |
Section: 10 | |
County/Municipality: Lamont County | |
Well Name: OMERS ENERGY UKALTA 15-10-56-18 | |
Operator Name: AlphaBow Energy Ltd. | |
License Number: 0217091 | |
License Date: 1998-08-20 | |
License Status: Suspension | |
Spud Date: 1999-06-12 | |
Final Drill Date: 1999-06-14 | |
Well Total Depth: 836.00 m | |
Surface Hole Latitude: 53.831804 | |
Surface Hole Longitude: -112.589350 |
Date | Event |
---|---|
1998-08-20 | Obtained License |
1999-06-12 | Surface Casing Operation Performed |
1999-06-14 | Finished Drilling |
1999-06-15 | Production Casing Operation Performed |
1999-06-15 | Well Log Performed |
1999-06-16 | Rig Released |
1999-06-16 | Well Mode changed to Drilled and Cased |
1999-06-22 | Perforation Treatment Performed - Jet Perforation |
1999-06-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-06-23 | Perforation Treatment Performed - Jet Perforation |
1999-06-23 | Plug Back Performed |
1999-12-11 | Well Began Production |
1999-12-11 | Well Fluid changed to Gas |
1999-12-11 | Well Mode changed to Flowing |
2001-07-01 | Well Fluid changed to Gas |
2001-07-01 | Well Mode changed to Suspended |
2004-05-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-05-25 | Perforation Treatment Performed - Jet Perforation |
2004-05-25 | Plug Back Performed |
2004-05-25 | Well Fluid changed to Gas |
2004-05-25 | Well Mode changed to Abandoned Zone |
2004-05-26 | Perforation Treatment Performed - Jet Perforation |
2004-10-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-10-02 | Plug Back Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1999-06-22 | Perforation | 825.00 | 827.00 | 17 |
1999-06-23 | Packing Device Capped w/Cement | 813.00 | 821.00 | 0 |
1999-06-23 | Perforation | 640.50 | 642.70 | 17 |
2004-05-25 | Packing Device Capped w/Cement | 627.00 | 635.00 | 0 |
2004-05-25 | Perforation | 158.50 | 160.00 | 17 |
2004-05-26 | Perforation | 140.00 | 142.00 | 17 |
2004-10-02 | Packing Device Capped w/Cement | 147.00 | 155.00 | 0 |
2004-10-02 | Packing Device Capped w/Cement | 127.00 | 135.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1999 | 497 | 0.0 | 0.0 | 0.0 |
2000 | 1705 | 0.0 | 0.0 | 0.0 |
For data sources see[5]