If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0564181416020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.842561,"lon":-112.558363,"icon":""}]} |
Location: 02/16-14-056-18W4/0 | |
Location Alias: 02/16-14-56-18 W4M | |
Location Alias 2: 02/16-14-056-18 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 056 | |
Meridian: 4 | |
Range: 18 | |
Section: 14 | |
County/Municipality: Lamont County | |
Well Name: OMERS ENERGY 102 UKALTA 16-14-56-18 | |
Operator Name: AlphaBow Energy Ltd. | |
License Number: 0330364 | |
License Date: 2005-05-04 | |
License Status: Suspension | |
Spud Date: 2005-05-23 | |
Final Drill Date: 2005-05-27 | |
Well Total Depth: 849.00 m | |
Surface Hole Latitude: 53.842561 | |
Surface Hole Longitude: -112.558363 |
Date | Event |
---|---|
2005-05-04 | Obtained License |
2005-05-23 | Surface Casing Operation Performed |
2005-05-25 | Direction Drilling Operation Performed - Deviate |
2005-05-27 | Finished Drilling |
2005-05-27 | Production Casing Operation Performed |
2005-05-27 | Rig Released |
2005-05-27 | Well Log Performed |
2005-05-27 | Well Mode changed to Drilled and Cased |
2005-06-01 | Perforation Treatment Performed - Jet Perforation |
2005-07-07 | Well Began Production |
2005-07-07 | Well Fluid changed to Gas |
2005-07-07 | Well Mode changed to Flowing |
2006-06-03 | Perforation Treatment Performed - Jet Perforation |
2007-05-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-05-25 | Perforation Treatment Performed - Jet Perforation |
2007-05-25 | Plug Back Performed |
2007-05-25 | Well Fluid changed to Gas |
2007-05-25 | Well Mode changed to Abandoned Zone |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2005-05-25 | 202.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-06-01 | Perforation | 802.50 | 804.50 | 17 |
2005-06-01 | Perforation | 798.00 | 800.00 | 17 |
2006-06-03 | Perforation | 787.30 | 788.50 | 17 |
2007-05-25 | Packing Device Capped w/Cement | 788.00 | 796.00 | 0 |
2007-05-25 | Perforation | 770.00 | 770.50 | 17 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 4416 | 0.0 | 0.0 | 0.0 |
2006 | 2210 | 0.0 | 0.0 | 0.0 |
For data sources see[6]