If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0564191504000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.840439,"lon":-112.754761,"icon":""}]} |
Location: 00/04-15-056-19W4/0 | |
Location Alias: 00/04-15-56-19 W4M | |
Location Alias 2: 00/04-15-056-19 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 056 | |
Meridian: 4 | |
Range: 19 | |
Section: 15 | |
County/Municipality: Lamont County | |
Well Name: TAC REDWATER 4-15-56-19 | |
Operator Name: Tamarack Acquisition Corp. | |
License Number: 0456326 | |
License Date: 2013-04-22 | |
License Status: Suspension | |
Spud Date: 2013-08-14 | |
Final Drill Date: 2013-08-20 | |
Well Total Depth: 1600.00 m | |
Surface Hole Latitude: 53.840439 | |
Surface Hole Longitude: -112.754761 |
Date | Event |
---|---|
2013-04-22 | Obtained License |
2013-08-15 | Surface Casing Operation Performed |
2013-08-17 | Direction Drilling Operation Performed - Deviate |
2013-08-17 | Direction Drilling Operation Performed - Horizontal |
2013-08-20 | Finished Drilling |
2013-08-20 | Well Log Performed |
2013-08-20 | Well Mode changed to Drilled and Cased |
2013-08-21 | Perforation Treatment Performed - Open-Hole Completion |
2013-08-21 | Production Casing Operation Performed |
2013-08-22 | Rig Released |
2013-11-02 | Well Began Production |
2013-11-02 | Well Fluid changed to Crude Oil |
2013-11-02 | Well Mode changed to Pumping |
2018-07-23 | Well Fluid changed to Crude Oil |
2018-07-23 | Well Mode changed to Suspended |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2013-08-14 | Horizon Drilling Inc. | 32 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2013-08-17 | 553.20 | Deviate (5 - 79 degrees) |
2013-08-17 | 982.20 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-08-21 | Open Hole/Barefoot Completion | 1066.00 | 1600.00 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 1350 | 0.0 | 0.0 | 0.0 |
2014 | 7356 | 0.0 | 0.0 | 0.0 |
2015 | 5434 | 0.0 | 0.0 | 0.0 |
2016 | 4652 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-08-22 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]