X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564200308020

Well Details

Well ID: 0564200308020
Loading map...
Location: 02/08-03-056-20W4/0
Location Alias: 02/08-03-56-20 W4M
Location Alias 2: 02/08-03-056-20 W4/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 20
Section: 03
County/Municipality: Lamont County
Well Name: TAC 102 HZ REDWATER 8-3-56-20
Operator Name: Tamarack Acquisition Corp.
License Number: 0443985
License Date: 2012-02-09
License Status: Issued
Spud Date: 2012-05-22
Final Drill Date: 2012-05-25
Well Total Depth: 1359.00 m
Surface Hole Latitude: 53.810145
Surface Hole Longitude: -112.891560

For data sources see[1][2]

Well History

Date Event
2012-02-09 Obtained License
2012-05-23 Surface Casing Operation Performed
2012-05-24 Direction Drilling Operation Performed - Horizontal
2012-05-25 Finished Drilling
2012-05-25 Well Mode changed to Drilled and Cased
2012-05-26 Production Casing Operation Performed
2012-05-26 Rig Released
2012-05-26 Well Log Performed
2012-05-31 Well Log Performed
2012-06-01 Well Began Production
2012-06-01 Well Fluid changed to Crude Oil
2012-06-01 Well Mode changed to Pumping
2012-06-03 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-05-22 Precision Drilling Corporation 137 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-05-24 460.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-06-03 Multi-Stage Fracture 1340.30 1340.60 0
2012-06-03 Multi-Stage Fracture 805.10 805.40 0
2012-06-03 Multi-Stage Fracture 1295.60 1295.90 0
2012-06-03 Multi-Stage Fracture 1247.40 1247.70 0
2012-06-03 Multi-Stage Fracture 1197.50 1197.80 0
2012-06-03 Multi-Stage Fracture 1149.30 1149.60 0
2012-06-03 Multi-Stage Fracture 1104.20 1104.50 0
2012-06-03 Multi-Stage Fracture 1059.10 1059.40 0
2012-06-03 Multi-Stage Fracture 972.20 972.50 0
2012-06-03 Multi-Stage Fracture 873.60 873.90 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 4795 0.0 0.0 0.0
2013 8624 0.0 0.0 0.0
2014 8679 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8735 0.0 0.0 0.0
2017 8553 0.0 0.0 0.0
2018 7211 0.0 0.0 0.0
2019 8241 0.0 0.0 0.0
2020 1632 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-05-26 No Incident Encountered 0.00 0.00
2012-06-05 No Incident Encountered 0.00 0.00

For data sources see[8]

References