If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0564200309000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.810419,"lon":-112.891105,"icon":""}]} |
| Location: 00/09-03-056-20W4/0 | |
| Location Alias: 00/09-03-56-20 W4M | |
| Location Alias 2: 00/09-03-056-20 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 056 | |
| Meridian: 4 | |
| Range: 20 | |
| Section: 03 | |
| County/Municipality: Lamont County | |
| Well Name: TAC HZ REDWATER 9-3-56-20 | |
| Operator Name: Tamarack Acquisition Corp. | |
| License Number: 0422210 | |
| License Date: 2010-07-27 | |
| License Status: Issued | |
| Spud Date: 2010-08-10 | |
| Final Drill Date: 2010-08-14 | |
| Well Total Depth: 1467.00 m | |
| Surface Hole Latitude: 53.810419 | |
| Surface Hole Longitude: -112.891105 |
| Date | Event |
|---|---|
| 2010-07-27 | Obtained License |
| 2010-08-11 | Direction Drilling Operation Performed - Horizontal |
| 2010-08-11 | Surface Casing Operation Performed |
| 2010-08-14 | Finished Drilling |
| 2010-08-14 | Well Mode changed to Drilled and Cased |
| 2010-08-15 | Production Casing Operation Performed |
| 2010-08-15 | Rig Released |
| 2010-08-23 | Well Log Performed |
| 2010-09-01 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2010-09-01 | Well Began Production |
| 2010-09-01 | Well Fluid changed to Crude Oil |
| 2010-09-01 | Well Mode changed to Pumping |
| 2010-09-02 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-08-14 | Well Log Performed |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2010-08-11 | 424.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2010-09-01 | Multi-Stage Fracture | 1448.20 | 1448.60 | 0 |
| 2010-09-02 | Multi-Stage Fracture | 898.00 | 898.40 | 0 |
| 2010-09-01 | Multi-Stage Fracture | 1405.30 | 1405.70 | 0 |
| 2010-09-01 | Multi-Stage Fracture | 1241.10 | 1241.40 | 0 |
| 2010-09-01 | Multi-Stage Fracture | 1211.60 | 1212.00 | 0 |
| 2010-09-01 | Multi-Stage Fracture | 1182.20 | 1182.60 | 0 |
| 2010-09-02 | Multi-Stage Fracture | 1152.80 | 1153.20 | 0 |
| 2010-09-02 | Multi-Stage Fracture | 1013.00 | 1013.40 | 0 |
| 2010-09-02 | Multi-Stage Fracture | 984.20 | 984.60 | 0 |
| 2010-09-02 | Multi-Stage Fracture | 940.90 | 941.30 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2010 | 2928 | 0.0 | 0.0 | 0.0 |
| 2011 | 8688 | 0.0 | 0.0 | 0.0 |
| 2012 | 8644 | 0.0 | 0.0 | 0.0 |
| 2013 | 8681 | 0.0 | 0.0 | 0.0 |
| 2014 | 8302 | 0.0 | 0.0 | 0.0 |
| 2015 | 8490 | 0.0 | 0.0 | 0.0 |
| 2016 | 7783 | 0.0 | 0.0 | 0.0 |
| 2017 | 8643 | 0.0 | 0.0 | 0.0 |
| 2018 | 8531 | 0.0 | 0.0 | 0.0 |
| 2019 | 8375 | 0.0 | 0.0 | 0.0 |
| 2020 | 1701 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2010-09-02 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]