If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0564200312020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.820719,"lon":-112.900122,"icon":""}]} |
Location: 02/12-03-056-20W4/0 | |
Location Alias: 02/12-03-56-20 W4M | |
Location Alias 2: 02/12-03-056-20 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 056 | |
Meridian: 4 | |
Range: 20 | |
Section: 03 | |
County/Municipality: Lamont County | |
Well Name: TAC 102 HZ REDWATER 12-3-56-20 | |
Operator Name: Tamarack Acquisition Corp. | |
License Number: 0448971 | |
License Date: 2012-10-03 | |
License Status: Issued | |
Spud Date: 2012-10-21 | |
Final Drill Date: 2012-10-24 | |
Well Total Depth: 1441.00 m | |
Surface Hole Latitude: 53.820719 | |
Surface Hole Longitude: -112.900122 |
Date | Event |
---|---|
2012-10-03 | Obtained License |
2012-10-21 | Surface Casing Operation Performed |
2012-10-21 | Well Log Performed |
2012-10-22 | Direction Drilling Operation Performed - Deviate |
2012-10-23 | Direction Drilling Operation Performed - Horizontal |
2012-10-24 | Finished Drilling |
2012-10-24 | Production Casing Operation Performed |
2012-10-24 | Well Mode changed to Drilled and Cased |
2012-10-25 | Rig Released |
2012-11-12 | Well Log Performed |
2012-11-17 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2012-11-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-11-18 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2012-11-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-12-01 | Well Began Production |
2012-12-01 | Well Fluid changed to Crude Oil |
2012-12-01 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2012-10-22 | 283.60 | Deviate (5 - 79 degrees) |
2012-10-23 | 820.40 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-11-17 | Hydra Jet Perforation | 1423.00 | 1423.10 | 0 |
2012-11-17 | Multi-Stage Fracture | 1257.10 | 1257.20 | 0 |
2012-11-17 | Hydra Jet Perforation | 1205.40 | 1205.50 | 0 |
2012-11-17 | Multi-Stage Fracture | 1205.40 | 1205.50 | 0 |
2012-11-17 | Hydra Jet Perforation | 1166.50 | 1166.60 | 0 |
2012-11-17 | Multi-Stage Fracture | 1166.50 | 1166.60 | 0 |
2012-11-17 | Hydra Jet Perforation | 1127.60 | 1127.70 | 0 |
2012-11-17 | Multi-Stage Fracture | 1127.60 | 1127.70 | 0 |
2012-11-17 | Hydra Jet Perforation | 1082.70 | 1082.80 | 0 |
2012-11-17 | Multi-Stage Fracture | 1082.70 | 1082.80 | 0 |
2012-11-17 | Hydra Jet Perforation | 1043.80 | 1043.90 | 0 |
2012-11-17 | Multi-Stage Fracture | 1423.00 | 1423.10 | 0 |
2012-11-17 | Multi-Stage Fracture | 1043.80 | 1043.90 | 0 |
2012-11-18 | Hydra Jet Perforation | 1004.80 | 1004.90 | 0 |
2012-11-18 | Multi-Stage Fracture | 1004.80 | 1004.90 | 0 |
2012-11-18 | Hydra Jet Perforation | 940.10 | 940.20 | 0 |
2012-11-18 | Multi-Stage Fracture | 940.10 | 940.20 | 0 |
2012-11-18 | Hydra Jet Perforation | 914.00 | 914.10 | 0 |
2012-11-18 | Multi-Stage Fracture | 914.00 | 914.10 | 0 |
2012-11-18 | Hydra Jet Perforation | 875.10 | 875.20 | 0 |
2012-11-18 | Multi-Stage Fracture | 875.10 | 875.20 | 0 |
2012-11-17 | Hydra Jet Perforation | 1382.30 | 1382.40 | 0 |
2012-11-17 | Multi-Stage Fracture | 1382.30 | 1382.40 | 0 |
2012-11-17 | Hydra Jet Perforation | 1339.10 | 1339.20 | 0 |
2012-11-17 | Multi-Stage Fracture | 1339.10 | 1339.20 | 0 |
2012-11-17 | Hydra Jet Perforation | 1296.00 | 1296.10 | 0 |
2012-11-17 | Multi-Stage Fracture | 1296.00 | 1296.10 | 0 |
2012-11-17 | Hydra Jet Perforation | 1257.10 | 1257.20 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 744 | 0.0 | 0.0 | 0.0 |
2013 | 8256 | 0.0 | 0.0 | 0.0 |
2014 | 8681 | 0.0 | 0.0 | 0.0 |
2015 | 8759 | 0.0 | 0.0 | 0.0 |
2016 | 8711 | 0.0 | 0.0 | 0.0 |
2017 | 7254 | 0.0 | 0.0 | 0.0 |
2018 | 8347 | 0.0 | 0.0 | 0.0 |
2019 | 6240 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-10-25 | No Incident Encountered | 0.00 | 0.00 |
2012-11-21 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]