If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0564200909000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.82734,"lon":-112.915522,"icon":""}]} |
| Location: 00/09-09-056-20W4/0 | |
| Location Alias: 00/09-09-56-20 W4M | |
| Location Alias 2: 00/09-09-056-20 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 056 | |
| Meridian: 4 | |
| Range: 20 | |
| Section: 09 | |
| County/Municipality: Lamont County | |
| Well Name: TAC REDWATER 9-9-56-20 | |
| Operator Name: Tamarack Acquisition Corp. | |
| License Number: 0437464 | |
| License Date: 2011-10-05 | |
| License Status: Issued | |
| Spud Date: 2011-11-09 | |
| Final Drill Date: 2011-11-16 | |
| Well Total Depth: 1438.00 m | |
| Surface Hole Latitude: 53.827340 | |
| Surface Hole Longitude: -112.915522 |
| Date | Event |
|---|---|
| 2011-10-05 | Obtained License |
| 2011-11-10 | Surface Casing Operation Performed |
| 2011-11-10 | Well Log Performed |
| 2011-11-11 | Direction Drilling Operation Performed - Deviate |
| 2011-11-12 | Direction Drilling Operation Performed - Horizontal |
| 2011-11-12 | Intermediate Casing Operation Performed |
| 2011-11-16 | Finished Drilling |
| 2011-11-16 | Well Log Performed |
| 2011-11-16 | Well Mode changed to Drilled and Cased |
| 2011-11-17 | Liner Casing Operation Performed |
| 2011-11-18 | Rig Released |
| 2011-11-25 | Well Log Performed |
| 2011-11-27 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-05-12 | Well Began Production |
| 2012-05-12 | Well Fluid changed to Crude Oil |
| 2012-05-12 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-11-11 | 140.00 | Deviate (5 - 79 degrees) |
| 2011-11-12 | 760.30 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-11-27 | Multi-Stage Fracture | 1393.30 | 1393.40 | 0 |
| 2011-11-27 | Multi-Stage Fracture | 1330.10 | 1330.20 | 0 |
| 2011-11-27 | Multi-Stage Fracture | 1269.00 | 1269.10 | 0 |
| 2011-11-27 | Multi-Stage Fracture | 1207.80 | 1207.90 | 0 |
| 2011-11-27 | Multi-Stage Fracture | 1118.60 | 1118.70 | 0 |
| 2011-11-27 | Multi-Stage Fracture | 1029.00 | 1029.10 | 0 |
| 2011-11-27 | Multi-Stage Fracture | 942.10 | 942.20 | 0 |
| 2011-11-27 | Multi-Stage Fracture | 852.90 | 853.00 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 4794 | 0.0 | 0.0 | 0.0 |
| 2013 | 7136 | 0.0 | 0.0 | 0.0 |
| 2014 | 8555 | 0.0 | 0.0 | 0.0 |
| 2015 | 8385 | 0.0 | 0.0 | 0.0 |
| 2016 | 8494 | 0.0 | 0.0 | 0.0 |
| 2017 | 8682 | 0.0 | 0.0 | 0.0 |
| 2018 | 8205 | 0.0 | 0.0 | 0.0 |
| 2019 | 8307 | 0.0 | 0.0 | 0.0 |
| 2020 | 2160 | 0.0 | 0.0 | 0.0 |
For data sources see[6]