X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564200911050

Well Details

Well ID: 0564200911050
Loading map...
Location: 05/11-09-056-20W4/0
Location Alias: 05/11-09-56-20 W4M
Location Alias 2: 05/11-09-056-20 W4/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 20
Section: 09
County/Municipality: Lamont County
Well Name: TAC REDWATER 11-9-56-20
Operator Name: Tamarack Acquisition Corp.
License Number: 0161755
License Date: 1993-10-22
License Status: Abandoned
Spud Date: 1993-10-26
Final Drill Date: 1993-11-02
Well Total Depth: 1495.00 m
Surface Hole Latitude: 53.827207
Surface Hole Longitude: -112.927006

For data sources see[1][2]

Well History

Date Event
1993-10-22 Obtained License
1993-10-27 Surface Casing Operation Performed
1993-10-28 Direction Drilling Operation Performed - Horizontal
1993-10-28 Well Log Performed
1993-10-30 Production Casing Operation Performed
1993-11-02 Finished Drilling
1993-11-02 Perforation Treatment Performed - Open-Hole Completion
1993-11-02 Well Mode changed to Drilled and Cased
1993-11-03 Rig Released
1993-11-04 Well Log Performed
1993-11-06 Well Log Performed
1993-11-10 Well Began Production
1993-11-10 Well Fluid changed to Crude Oil
1993-11-10 Well Mode changed to Pumping
2000-09-22 Well Fluid changed to Crude Oil
2000-09-22 Well Mode changed to Suspended
2004-07-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-08-25 Perforation Treatment Performed - Cement Plug
2011-08-25 Plug Back Performed
2011-08-25 Well Fluid changed to Crude Oil
2011-08-25 Well Mode changed to Abandoned Zone
2014-12-31 Well Abandoned
2014-12-31 Well Fluid changed to Crude Oil
2014-12-31 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-10-28 692.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-11-02 Open Hole/Barefoot Completion 942.00 1495.00 0
2004-07-23 Packing Device Capped w/Cement 853.00 873.00 0
2011-08-25 Cement Plug 720.00 866.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 1264 0.0 0.0 0.0
1994 8447 0.0 0.0 0.0
1995 8591 0.0 0.0 0.0
1996 8339 0.0 0.0 0.0
1997 8442 0.0 0.0 0.0
1998 2344 0.0 0.0 0.0

For data sources see[6]

References