X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564200914040

Well Details

Well ID: 0564200914040
Loading map...
Location: 04/14-09-056-20W4/0
Location Alias: 04/14-09-56-20 W4M
Location Alias 2: 04/14-09-056-20 W4/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 20
Section: 09
County/Municipality: Lamont County
Well Name: TAC REDWATER 14-9-56-20
Operator Name: Tamarack Acquisition Corp.
License Number: 0161109
License Date: 1993-09-22
License Status: Abandoned
Spud Date: 1993-09-27
Final Drill Date: 1993-10-06
Well Total Depth: 1602.00 m
Surface Hole Latitude: 53.828328
Surface Hole Longitude: -112.927677

For data sources see[1][2]

Well History

Date Event
1993-09-22 Obtained License
1993-09-28 Surface Casing Operation Performed
1993-09-29 Direction Drilling Operation Performed - Horizontal
1993-10-01 Production Casing Operation Performed
1993-10-06 Finished Drilling
1993-10-06 Perforation Treatment Performed - Open-Hole Completion
1993-10-06 Rig Released
1993-10-06 Well Log Performed
1993-10-06 Well Mode changed to Drilled and Cased
1993-10-08 Well Log Performed
1993-10-09 Well Began Production
1993-10-09 Well Fluid changed to Crude Oil
1993-10-09 Well Mode changed to Pumping
1993-10-12 Well Log Performed
1995-06-25 Perforation Treatment Performed - Chemical Squeeze
2008-03-01 Well Fluid changed to Crude Oil
2008-03-01 Well Mode changed to Suspended
2014-11-23 Perforation Treatment Performed - Cement Plug
2014-11-23 Plug Back Performed
2014-11-23 Well Fluid changed to Crude Oil
2014-11-23 Well Mode changed to Abandoned Zone
2014-11-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-11-24 Plug Back Performed
2014-12-30 Well Abandoned
2014-12-30 Well Fluid changed to Crude Oil
2014-12-30 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-09-29 692.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-10-06 Open Hole/Barefoot Completion 980.00 1602.00 0
1995-06-25 Chemical Squeeze 980.00 1602.00 0
2014-11-23 Cement Plug 671.50 1155.00 0
2014-11-24 Packing Device Capped w/Cement 624.00 670.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 1924 0.0 0.0 0.0
1994 8493 0.0 0.0 0.0
1995 8061 0.0 0.0 0.0
1996 8266 0.0 0.0 0.0
1997 7939 0.0 0.0 0.0
1998 7207 0.0 0.0 0.0
1999 6873 0.0 0.0 0.0
2000 8418 0.0 0.0 0.0
2001 8298 0.0 0.0 0.0
2002 8524 0.0 0.0 0.0
2003 7970 0.0 0.0 0.0
2004 7834 0.0 0.0 0.0
2005 3769 0.0 0.0 0.0
2006 816 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-11-24 No Incident Encountered 0.00 0.00

For data sources see[7]

References