X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564201506080

Well Details

Well ID: 0564201506080
Loading map...
Location: 08/06-15-056-20W4/0
Location Alias: 08/06-15-56-20 W4M
Location Alias 2: 08/06-15-056-20 W4/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 20
Section: 15
County/Municipality: Lamont County
Well Name: TAC 14-10 HZ 108 REDWATER 6-15-56-20
Operator Name: Tamarack Acquisition Corp.
License Number: 0487458
License Date: 2017-12-20
License Status: Amended
Spud Date: 2018-02-06
Final Drill Date: 2018-02-21
Well Total Depth: 1474.00 m
Surface Hole Latitude: 53.831597
Surface Hole Longitude: -112.891190

For data sources see[1][2]

Well History

Date Event
2017-12-20 Obtained License
2018-02-07 Surface Casing Operation Performed
2018-02-20 Direction Drilling Operation Performed - Deviate
2018-02-21 Direction Drilling Operation Performed - Horizontal
2018-02-21 Finished Drilling
2018-02-21 Well Log Performed
2018-02-21 Well Mode changed to Drilled and Cased
2018-02-22 Well Log Performed
2018-02-23 Production Casing Operation Performed
2018-02-23 Rig Released
2018-02-28 Perforation Treatment Performed - Jet Perforation
2018-03-07 Well Began Production
2018-03-07 Well Fluid changed to Crude Oil
2018-03-07 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-02-06 Predator Drilling Inc. 29 N/A Set Surface
2018-02-20 Precision Drilling Corporation 157 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-02-20 288.80 Deviate (5 - 79 degrees)
2018-02-21 969.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-02-28 Perforation 1455.00 1456.00 17
2018-02-28 Perforation 1410.90 1411.90 17
2018-02-28 Perforation 1406.00 1407.00 17
2018-02-28 Perforation 1401.10 1402.10 17
2018-02-28 Perforation 1396.20 1397.20 17
2018-02-28 Perforation 1391.30 1392.30 17
2018-02-28 Perforation 1386.40 1387.40 17
2018-02-28 Perforation 1381.50 1382.50 17
2018-02-28 Perforation 1377.00 1378.00 17
2018-02-28 Perforation 1371.70 1372.70 17
2018-02-28 Perforation 1366.80 1367.80 17
2018-02-28 Perforation 1450.10 1451.10 17
2018-02-28 Perforation 1361.50 1362.50 17
2018-02-28 Perforation 1357.00 1358.00 17
2018-02-28 Perforation 1352.10 1353.10 17
2018-02-28 Perforation 1342.30 1343.30 17
2018-02-28 Perforation 1337.40 1338.40 17
2018-02-28 Perforation 1332.50 1333.50 17
2018-02-28 Perforation 1327.60 1328.60 17
2018-02-28 Perforation 1323.00 1324.00 17
2018-02-28 Perforation 1317.80 1318.80 17
2018-02-28 Perforation 1312.90 1313.90 17
2018-02-28 Perforation 1445.20 1446.20 17
2018-02-28 Perforation 1307.70 1308.70 17
2018-02-28 Perforation 1303.10 1304.10 17
2018-02-28 Perforation 1298.20 1299.20 17
2018-02-28 Perforation 1293.30 1294.30 17
2018-02-28 Perforation 1288.40 1289.40 17
2018-02-28 Perforation 1283.50 1284.50 17
2018-02-28 Perforation 1278.60 1279.60 17
2018-02-28 Perforation 1273.70 1274.70 17
2018-02-28 Perforation 1268.80 1269.80 17
2018-02-28 Perforation 1263.90 1264.90 17
2018-02-28 Perforation 1440.30 1441.30 17
2018-02-28 Perforation 1259.00 1260.00 17
2018-02-28 Perforation 1253.30 1254.30 17
2018-02-28 Perforation 1249.20 1250.20 17
2018-02-28 Perforation 1244.30 1245.30 17
2018-02-28 Perforation 1239.40 1240.40 17
2018-02-28 Perforation 1234.50 1235.50 17
2018-02-28 Perforation 1229.60 1230.60 17
2018-02-28 Perforation 1224.70 1225.70 17
2018-02-28 Perforation 1219.80 1220.80 17
2018-02-28 Perforation 1215.00 1216.00 17
2018-02-28 Perforation 1435.40 1436.40 17
2018-02-28 Perforation 1210.00 1211.00 17
2018-02-28 Perforation 1205.10 1206.10 17
2018-02-28 Perforation 1199.50 1200.50 17
2018-02-28 Perforation 1195.30 1196.30 17
2018-02-28 Perforation 1190.40 1191.40 17
2018-02-28 Perforation 1185.50 1186.50 17
2018-02-28 Perforation 1180.60 1181.60 17
2018-02-28 Perforation 1175.00 1176.00 17
2018-02-28 Perforation 1169.00 1170.00 17
2018-02-28 Perforation 1163.00 1164.00 17
2018-02-28 Perforation 1431.00 1432.00 17
2018-02-28 Perforation 1118.00 1119.00 17
2018-02-28 Perforation 1112.60 1113.60 17
2018-02-28 Perforation 1107.20 1108.20 17
2018-02-28 Perforation 1101.80 1102.80 17
2018-02-28 Perforation 1096.40 1097.40 17
2018-02-28 Perforation 1091.00 1092.00 17
2018-02-28 Perforation 1085.60 1086.60 17
2018-02-28 Perforation 1080.20 1081.20 17
2018-02-28 Perforation 1074.80 1075.80 17
2018-02-28 Perforation 1069.40 1070.40 17
2018-02-28 Perforation 1425.60 1426.60 17
2018-02-28 Perforation 1064.00 1065.00 17
2018-02-28 Perforation 1058.60 1059.60 17
2018-02-28 Perforation 1053.20 1054.20 17
2018-02-28 Perforation 1047.70 1048.70 17
2018-02-28 Perforation 1042.30 1043.30 17
2018-02-28 Perforation 1036.90 1037.90 17
2018-02-28 Perforation 1031.50 1032.50 17
2018-02-28 Perforation 1026.10 1027.10 17
2018-02-28 Perforation 1020.50 1021.50 17
2018-02-28 Perforation 1015.00 1016.00 17
2018-02-28 Perforation 1420.70 1421.70 17
2018-02-28 Perforation 1415.50 1416.50 17

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 6292 0.0 0.0 0.0
2019 7397 0.0 0.0 0.0
2020 1951 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-02-23 No Incident Encountered 0.00 0.00
2018-03-01 No Incident Encountered 0.00 0.00

For data sources see[8]

References