X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564201507000

Well Details

Well ID: 0564201507000
Loading map...
Location: 00/07-15-056-20W4/0
Location Alias: 00/07-15-56-20 W4M
Location Alias 2: 00/07-15-056-20 W4/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 20
Section: 15
County/Municipality: Lamont County
Well Name: TAC REDWATER 7-15-56-20
Operator Name: Tamarack Acquisition Corp.
License Number: 0078037
License Date: 1979-09-14
License Status: Suspension
Spud Date: 1979-10-03
Final Drill Date: 1979-10-06
Well Total Depth: 919.00 m
Surface Hole Latitude: 53.836714
Surface Hole Longitude: -112.885697

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-09-14 Obtained License
1979-10-06 Drill Stem Test Performed
1979-10-06 Finished Drilling
1979-10-06 Well Log Performed
1979-10-06 Well Mode changed to Drilled and Cased
1979-10-07 Drill Stem Test Performed
1979-10-08 Drill Stem Test Performed
1979-10-09 Drill Stem Test Performed
1979-10-09 Production Casing Operation Performed
1979-10-18 Perforation Treatment Performed - Jet Perforation
1979-10-19 Perforation Treatment Performed - Jet Perforation
1979-11-08 Well Began Production
1979-11-08 Well Fluid changed to Crude Oil
1979-11-08 Well Mode changed to Pumping
1986-06-01 Well Fluid changed to Crude Oil
1986-06-01 Well Mode changed to Suspended
1992-07-08 Well Fluid changed to Crude Oil
1992-07-08 Well Mode changed to Pumping
1999-07-21 Well Fluid changed to Crude Oil
1999-07-21 Well Mode changed to Suspended
2001-12-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-12-08 Plug Back Performed
2001-12-08 Well Fluid changed to Crude Oil
2001-12-08 Well Log Performed
2001-12-08 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-10-18 Perforation 850.00 851.00 14
1979-10-19 Perforation 851.50 852.00 14
2001-12-08 Packing Device Capped w/Cement 832.00 840.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 1152 0.0 0.0 0.0
1980 8443 0.0 0.0 0.0
1981 6577 0.0 0.0 0.0
1982 5851 0.0 0.0 0.0
1983 8130 0.0 0.0 0.0
1984 8269 0.0 0.0 0.0
1985 8320 0.0 0.0 0.0
1986 1062 0.0 0.0 0.0
1992 3570 0.0 0.0 0.0
1993 7520 0.0 0.0 0.0
1994 3887 0.0 0.0 0.0
1999 1719 0.0 0.0 0.0

For data sources see[5]

References