If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0564201602A00 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.832193,"lon":-112.920865,"icon":""}]} |
Location: A0/02-16-056-20W4/0 | |
Location Alias: A0/02-16-56-20 W4M | |
Location Alias 2: A0/02-16-056-20 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 056 | |
Meridian: 4 | |
Range: 20 | |
Section: 16 | |
County/Municipality: Lamont County | |
Well Name: TAC REDWATER 2-16-56-20 | |
Operator Name: Tamarack Acquisition Corp. | |
License Number: 0167207 | |
License Date: 1994-05-17 | |
License Status: Abandoned | |
Spud Date: 1994-05-25 | |
Final Drill Date: 1994-06-02 | |
Well Total Depth: 1503.00 m | |
Surface Hole Latitude: 53.832193 | |
Surface Hole Longitude: -112.920865 |
Date | Event |
---|---|
1994-05-17 | Obtained License |
1994-05-26 | Surface Casing Operation Performed |
1994-05-27 | Direction Drilling Operation Performed - Horizontal |
1994-05-30 | Perforation Treatment Performed - Open-Hole Completion |
1994-05-30 | Production Casing Operation Performed |
1994-06-02 | Finished Drilling |
1994-06-02 | Well Mode changed to Drilled and Cased |
1994-06-03 | Rig Released |
1994-06-06 | Well Log Performed |
1994-06-09 | Well Began Production |
1994-06-09 | Well Fluid changed to Crude Oil |
1994-06-09 | Well Mode changed to Pumping |
2008-05-07 | Well Fluid changed to Crude Oil |
2008-05-07 | Well Mode changed to Suspended |
2014-10-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2014-10-25 | Plug Back Performed |
2014-10-25 | Well Fluid changed to Crude Oil |
2014-10-25 | Well Mode changed to Abandoned Zone |
2014-11-14 | Well Abandoned |
2014-11-14 | Well Fluid changed to Crude Oil |
2014-11-14 | Well Mode changed to Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1994-05-27 | 642.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1994-05-30 | Open Hole/Barefoot Completion | 990.00 | 1503.00 | 0 |
2014-10-25 | Packing Device Capped w/Cement | 420.50 | 665.90 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1994 | 4754 | 0.0 | 0.0 | 0.0 |
1995 | 5590 | 0.0 | 0.0 | 0.0 |
1996 | 8604 | 0.0 | 0.0 | 0.0 |
1997 | 8722 | 0.0 | 0.0 | 0.0 |
1998 | 8145 | 0.0 | 0.0 | 0.0 |
1999 | 7121 | 0.0 | 0.0 | 0.0 |
2000 | 8476 | 0.0 | 0.0 | 0.0 |
2001 | 7707 | 0.0 | 0.0 | 0.0 |
2002 | 8692 | 0.0 | 0.0 | 0.0 |
2003 | 8669 | 0.0 | 0.0 | 0.0 |
2004 | 8253 | 0.0 | 0.0 | 0.0 |
2005 | 8303 | 0.0 | 0.0 | 0.0 |
2006 | 8058 | 0.0 | 0.0 | 0.0 |
2007 | 3224 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-10-26 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]