If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0564202008002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.851509,"lon":-112.931431,"icon":""}]} |
Location: 00/08-20-056-20W4/2 | |
Location Alias: 00/08-20-56-20 W4M | |
Location Alias 2: 00/08-20-056-20 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 056 | |
Meridian: 4 | |
Range: 20 | |
Section: 20 | |
County/Municipality: Lamont County | |
Well Name: TAC REDWATER 8-20-56-20 | |
Operator Name: Tamarack Acquisition Corp. | |
License Number: 0081550 | |
License Date: 1980-03-07 | |
License Status: Suspension | |
Spud Date: 1980-05-18 | |
Final Drill Date: 1980-05-24 | |
Well Total Depth: 890.00 m | |
Surface Hole Latitude: 53.851509 | |
Surface Hole Longitude: -112.931431 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-03-07 | Obtained License |
1980-05-24 | Finished Drilling |
1980-05-25 | Drill Stem Test Performed |
1980-05-25 | Well Log Performed |
1980-05-26 | Drill Stem Test Performed |
1980-05-28 | Production Casing Operation Performed |
1980-06-19 | Perforation Treatment Performed - Jet Perforation |
1980-06-23 | Perforation Treatment Performed - Fractured |
1980-06-24 | Perforation Treatment Performed - Jet Perforation |
1980-06-24 | Well Mode changed to Drilled and Cased |
1980-12-09 | Well Began Production |
1980-12-09 | Well Fluid changed to Gas |
1980-12-09 | Well Mode changed to Flowing |
1983-12-01 | Well Fluid changed to Gas |
1983-12-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-06-19 | Perforation | 644.00 | 647.50 | 14 |
1980-06-23 | Fracture | 644.00 | 647.50 | 0 |
1980-06-24 | Perforation | 633.00 | 635.50 | 14 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1980 | 552 | 0.0 | 0.0 | 0.0 |
1981 | 7955 | 0.0 | 0.0 | 0.0 |
1982 | 8475 | 0.0 | 0.0 | 0.0 |
1983 | 5635 | 0.0 | 0.0 | 0.0 |
For data sources see[5]