X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564202016000

Well Details

Well ID: 0564202016000
Loading map...
Location: 00/16-20-056-20W4/0
Location Alias: 00/16-20-56-20 W4M
Location Alias 2: 00/16-20-056-20 W4/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 20
Section: 20
County/Municipality: Lamont County
Well Name: TAC REDWATER 16-20-56-20
Operator Name: Tamarack Acquisition Corp.
License Number: 0421395
License Date: 2010-06-24
License Status: Issued
Spud Date: 2010-07-21
Final Drill Date: 2010-07-27
Well Total Depth: 1377.00 m
Surface Hole Latitude: 53.853725
Surface Hole Longitude: -112.932284

For data sources see[1][2]

Well History

Date Event
2010-06-24 Obtained License
2010-07-22 Surface Casing Operation Performed
2010-07-23 Direction Drilling Operation Performed - Deviate
2010-07-24 Direction Drilling Operation Performed - Horizontal
2010-07-24 Intermediate Casing Operation Performed
2010-07-24 Well Log Performed
2010-07-27 Finished Drilling
2010-07-27 Well Log Performed
2010-07-27 Well Mode changed to Drilled and Cased
2010-07-28 Liner Casing Operation Performed
2010-07-28 Perforation Treatment Performed - Open-Hole Completion
2010-07-29 Rig Released
2010-08-23 Perforation Treatment Performed - Multi-Stage Fracture
2011-06-10 Well Began Production
2011-06-10 Well Fluid changed to Crude Oil
2011-06-10 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-07-23 120.00 Deviate (5 - 79 degrees)
2010-07-24 743.70 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-07-28 Open Hole/Barefoot Completion 789.00 1377.00 0
2010-08-23 Multi-Stage Fracture 1281.30 1354.80 0
2010-08-23 Multi-Stage Fracture 1198.10 1297.70 0
2010-08-23 Multi-Stage Fracture 1128.10 1196.50 0
2010-08-23 Multi-Stage Fracture 1044.30 1126.20 0
2010-08-23 Multi-Stage Fracture 961.20 1042.70 0
2010-08-23 Multi-Stage Fracture 878.40 959.60 0
2010-08-23 Multi-Stage Fracture 795.10 876.80 0
2010-08-23 Multi-Stage Fracture 752.20 793.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 2707 0.0 0.0 0.0
2012 8121 0.0 0.0 0.0
2013 7813 0.0 0.0 0.0
2014 7687 0.0 0.0 0.0
2015 7478 0.0 0.0 0.0
2016 7176 0.0 0.0 0.0
2017 8294 0.0 0.0 0.0
2018 3463 0.0 0.0 0.0
2019 3930 0.0 0.0 0.0
2020 973 0.0 0.0 0.0

For data sources see[6]

References