If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0564211209020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.829379,"lon":-112.993494,"icon":""}]} |
Location: 02/09-12-056-21W4/0 | |
Location Alias: 02/09-12-56-21 W4M | |
Location Alias 2: 02/09-12-056-21 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 056 | |
Meridian: 4 | |
Range: 21 | |
Section: 12 | |
County/Municipality: Strathcona County | |
Well Name: LONG RUN HZ 102 REDWATER 9-12-56-21 | |
Operator Name: Long Run Exploration Ltd. | |
License Number: 0480237 | |
License Date: 2016-08-30 | |
License Status: Issued | |
Spud Date: 2016-09-29 | |
Final Drill Date: 2016-10-02 | |
Well Total Depth: 1708.00 m | |
Surface Hole Latitude: 53.829379 | |
Surface Hole Longitude: -112.993494 |
Date | Event |
---|---|
2016-08-30 | Obtained License |
2016-09-29 | Surface Casing Operation Performed |
2016-09-30 | Direction Drilling Operation Performed - Deviate |
2016-09-30 | Direction Drilling Operation Performed - Horizontal |
2016-10-02 | Finished Drilling |
2016-10-02 | Production Casing Operation Performed |
2016-10-02 | Rig Released |
2016-10-02 | Well Log Performed |
2016-10-02 | Well Mode changed to Drilled and Cased |
2016-11-18 | Well Log Performed |
2016-12-05 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-01-21 | Well Began Production |
2017-01-21 | Well Fluid changed to Crude Oil |
2017-01-21 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2016-09-29 | Bonanza Drilling Inc. | 5 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2016-09-30 | 314.00 | Deviate (5 - 79 degrees) |
2016-09-30 | 866.10 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2016-12-05 | Multi-Stage Fracture | 1639.00 | 1639.10 | 0 |
2016-12-05 | Multi-Stage Fracture | 1370.00 | 1370.10 | 0 |
2016-12-05 | Multi-Stage Fracture | 1340.00 | 1340.10 | 0 |
2016-12-05 | Multi-Stage Fracture | 1310.00 | 1310.10 | 0 |
2016-12-05 | Multi-Stage Fracture | 1278.00 | 1278.10 | 0 |
2016-12-05 | Multi-Stage Fracture | 1275.00 | 1275.10 | 0 |
2016-12-05 | Multi-Stage Fracture | 1247.00 | 1247.10 | 0 |
2016-12-05 | Multi-Stage Fracture | 1220.00 | 1220.10 | 0 |
2016-12-05 | Multi-Stage Fracture | 1191.00 | 1191.10 | 0 |
2016-12-05 | Multi-Stage Fracture | 1158.00 | 1158.10 | 0 |
2016-12-05 | Multi-Stage Fracture | 1130.00 | 1130.10 | 0 |
2016-12-05 | Multi-Stage Fracture | 1610.00 | 1610.10 | 0 |
2016-12-05 | Multi-Stage Fracture | 1100.00 | 1100.10 | 0 |
2016-12-05 | Multi-Stage Fracture | 1072.00 | 1072.10 | 0 |
2016-12-05 | Multi-Stage Fracture | 1040.00 | 1040.10 | 0 |
2016-12-05 | Multi-Stage Fracture | 1010.00 | 1010.10 | 0 |
2016-12-05 | Multi-Stage Fracture | 980.00 | 980.10 | 0 |
2016-12-05 | Multi-Stage Fracture | 951.00 | 951.10 | 0 |
2016-12-05 | Multi-Stage Fracture | 1580.00 | 1580.10 | 0 |
2016-12-05 | Multi-Stage Fracture | 1550.00 | 1550.10 | 0 |
2016-12-05 | Multi-Stage Fracture | 1519.00 | 1519.10 | 0 |
2016-12-05 | Multi-Stage Fracture | 1490.00 | 1490.10 | 0 |
2016-12-05 | Multi-Stage Fracture | 1460.00 | 1460.10 | 0 |
2016-12-05 | Multi-Stage Fracture | 1430.00 | 1430.10 | 0 |
2016-12-05 | Multi-Stage Fracture | 1398.00 | 1398.10 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2016-12-05 | 2016-12-05 | 669 | 725 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Potassium Chloride | 7447-40-7 | 100 | 83.8194 | N/A | |||
Water | 7732-18-5 | 100 | 83.8194 | N/A | ||||
Sand (20/40) | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 1.5254 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 1.5254 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 1.5254 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 1.5254 | N/A | ||||
Yukon Black (16/30) | Canyon Technical Services | Crystalline silica. quartz | 14808-60-7 | 100 | 13.94 | N/A | ||
Furfuryl Alcohol | 98-00-0 | 100 | 13.94 | N/A | ||||
Tolcide PS75LT | Canyon Technical Services | Bactericide/Biocide | Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0173 | N/A | |
Water | 7732-18-5 | 100 | 0.0173 | N/A | ||||
CAN-2300 Breaker (Enzyme HpH) | Canyon Technical Services | Breaker | Cellulase Enzyme Solution | Not Available | 100 | 0.0012 | N/A | |
CAN-2301 Breaker (Oxidizer) | Canyon Technical Services | Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.0277 | N/A | |
Non-hazardous base ingredient(s) | Not Available | 100 | 0.0277 | N/A | ||||
CAN-1911 Clay Stabilizer | Canyon Technical Services | Clay Control | 1.6-Hexandiamine. dihydrochloride | 6055-52-3 | 100 | 0.3619 | N/A | |
Water | 7732-18-5 | 100 | 0.3619 | N/A | ||||
CAN-2200 Crosslinker / pH buffer (Borate) | Canyon Technical Services | Crosslinker | Boric Acid | 10043-35-3 | 100 | 0.2023 | N/A | |
Monoethanolamine | 141-43-5 | 100 | 0.2023 | N/A | ||||
Water | 7732-18-5 | 100 | 0.2023 | N/A | ||||
CAN-2412 Non-emulsifier | Canyon Technical Services | Demulsifier | 1-Hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues |
68609-68-7 | 100 | 0.0393 | N/A | |
Benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol (1:1) |
26836-07-7 | 100 | 0.0393 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.0393 | N/A | ||||
Poly(oxyethelyne. oxypropylene) copolymer. liquids | 11/6/9003 | 100 | 0.0393 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0393 | N/A | ||||
CAN-2000 Gellant (Guar) | Canyon Technical Services | Gelling Agent | Polysacharide Suspension | Not Available | 100 | 0.4807 | N/A | |
paraFLO 2 | Canyon Technical Services | Scale Inhibitor | Non-hazardous base ingredient(s) | Not Available | 100 | 0.1418 | N/A | |
Silica. crystalline-quartz | 14808-60-7 | 100 | 0.1418 | N/A | ||||
White mineral oil | 8042-47-5 | 100 | 0.1418 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2016-12-04 | 2016-12-05 | Municipal Water | 627 |
2016-12-04 | 2016-12-05 | Groundwater - Saline | 20 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 7000 | 0.0 | 0.0 | 0.0 |
2018 | 8629 | 0.0 | 0.0 | 0.0 |
2019 | 8647 | 0.0 | 0.0 | 0.0 |
2020 | 2127 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2016-10-02 | No Incident Encountered | 0.00 | 0.00 |
2016-12-19 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]