If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0564211505020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.837737,"lon":-113.034052,"icon":""}]} |
Location: 02/05-15-056-21W4/0 | |
Location Alias: 02/05-15-56-21 W4M | |
Location Alias 2: 02/05-15-056-21 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 056 | |
Meridian: 4 | |
Range: 21 | |
Section: 15 | |
County/Municipality: Strathcona County | |
Well Name: LONG RUN HZ 102 REDWATER 5-15-56-21 | |
Operator Name: Long Run Exploration Ltd. | |
License Number: 0480781 | |
License Date: 2016-10-14 | |
License Status: Amended | |
Spud Date: 2017-01-15 | |
Final Drill Date: 2017-01-17 | |
Well Total Depth: 1500.00 m | |
Surface Hole Latitude: 53.837737 | |
Surface Hole Longitude: -113.034052 |
Date | Event |
---|---|
2016-10-14 | Obtained License |
2017-01-15 | Surface Casing Operation Performed |
2017-01-16 | Direction Drilling Operation Performed - Deviate |
2017-01-16 | Direction Drilling Operation Performed - Horizontal |
2017-01-17 | Finished Drilling |
2017-01-17 | Production Casing Operation Performed |
2017-01-17 | Well Log Performed |
2017-01-17 | Well Mode changed to Drilled and Cased |
2017-01-18 | Rig Released |
2017-02-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-02-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-03-01 | Well Began Production |
2017-03-01 | Well Fluid changed to Crude Oil |
2017-03-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2017-01-15 | Bonanza Drilling Inc. | 5 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2017-01-16 | 315.60 | Deviate (5 - 79 degrees) |
2017-01-16 | 761.80 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-02-03 | Multi-Stage Fracture | 1478.00 | 1478.10 | 0 |
2017-02-03 | Multi-Stage Fracture | 1218.00 | 1218.10 | 0 |
2017-02-03 | Multi-Stage Fracture | 1188.00 | 1188.10 | 0 |
2017-02-03 | Multi-Stage Fracture | 1159.00 | 1159.10 | 0 |
2017-02-03 | Multi-Stage Fracture | 1130.00 | 1130.10 | 0 |
2017-02-03 | Multi-Stage Fracture | 1101.00 | 1101.10 | 0 |
2017-02-03 | Multi-Stage Fracture | 1073.00 | 1073.10 | 0 |
2017-02-03 | Multi-Stage Fracture | 1043.00 | 1043.10 | 0 |
2017-02-04 | Multi-Stage Fracture | 1014.00 | 1014.10 | 0 |
2017-02-04 | Multi-Stage Fracture | 985.00 | 985.10 | 0 |
2017-02-04 | Multi-Stage Fracture | 956.00 | 956.10 | 0 |
2017-02-03 | Multi-Stage Fracture | 1449.00 | 1449.10 | 0 |
2017-02-04 | Multi-Stage Fracture | 927.00 | 927.10 | 0 |
2017-02-03 | Multi-Stage Fracture | 1420.00 | 1420.10 | 0 |
2017-02-03 | Multi-Stage Fracture | 1391.00 | 1391.10 | 0 |
2017-02-03 | Multi-Stage Fracture | 1362.00 | 1362.10 | 0 |
2017-02-03 | Multi-Stage Fracture | 1333.00 | 1333.10 | 0 |
2017-02-03 | Multi-Stage Fracture | 1304.00 | 1304.10 | 0 |
2017-02-03 | Multi-Stage Fracture | 1275.00 | 1275.10 | 0 |
2017-02-03 | Multi-Stage Fracture | 1246.00 | 1246.10 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-02-03 | 2017-02-04 | 674 | 421 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Potassium Chloride | 7447-40-7 | 100 | 78.4939 | N/A | |||
Water | 7732-18-5 | 100 | 78.4939 | N/A | ||||
Sand (20/40) | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 1.8974 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 1.8974 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 1.8974 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 1.8973 | N/A | ||||
Yukon Black (16/30) | Canyon Technical Services | Crystalline silica. quartz | 14808-60-7 | 100 | 18.2139 | N/A | ||
Furfuryl Alcohol | 98-00-0 | 100 | 18.2139 | N/A | ||||
BioClear 1000 | Canyon Technical Services | Bactericide/Biocide | Acetamide. 2.2-dibromo-2-cyano- | 10222-01-2 | 100 | 0.0034 | N/A | |
Tolcide PS75LT | Canyon Technical Services | Bactericide/Biocide | Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0241 | N/A | |
Water | 7732-18-5 | 100 | 0.0241 | N/A | ||||
CAN-2300 Breaker (Enzyme HpH. 50L:1L) | Canyon Technical Services | Breaker | Cellulase Enzyme Solution | Not Available | 100 | 0.0934 | N/A | |
Water | 7732-18-5 | 100 | 0.0934 | N/A | ||||
CAN-2301 Breaker (Oxidizer) | Canyon Technical Services | Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.0375 | N/A | |
Non-hazardous base ingredient(s) | Not Available | 100 | 0.0375 | N/A | ||||
CAN-1911 Clay Stabilizer | Canyon Technical Services | Clay Control | 1.6-Hexandiamine. dihydrochloride | 6055-52-3 | 100 | 0.4095 | N/A | |
Water | 7732-18-5 | 100 | 0.4095 | N/A | ||||
CAN-2200 Crosslinker / pH buffer (Borate) | Canyon Technical Services | Crosslinker | Boric Acid | 10043-35-3 | 100 | 0.17 | N/A | |
Monoethanolamine | 141-43-5 | 100 | 0.17 | N/A | ||||
Water | 7732-18-5 | 100 | 0.17 | N/A | ||||
CAN-2412 Non-emulsifier | Canyon Technical Services | Demulsifier | 1-Hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues |
68609-68-7 | 100 | 0.0352 | N/A | |
Benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol (1:1) |
26836-07-7 | 100 | 0.0352 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.0352 | N/A | ||||
Poly(oxyethelyne. oxypropylene) copolymer. liquids | 11/6/9003 | 100 | 0.0352 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0352 | N/A | ||||
CAN-2000 Gellant (Guar) | Canyon Technical Services | Gelling Agent | Polysacharide Suspension | Not Available | 100 | 0.4498 | N/A | |
paraFLO 2 | Canyon Technical Services | Scale Inhibitor | Non-hazardous base ingredient(s) | Not Available | 100 | 0.1712 | N/A | |
Silica. crystalline-quartz | 14808-60-7 | 100 | 0.1712 | N/A | ||||
White mineral oil | 8042-47-5 | 100 | 0.1712 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-02-02 | 2017-02-03 | Municipal Water | 364 |
2017-02-02 | 2017-02-03 | Groundwater - Saline | 11 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 7110 | 0.0 | 0.0 | 0.0 |
2018 | 8464 | 0.0 | 0.0 | 0.0 |
2019 | 8654 | 0.0 | 0.0 | 0.0 |
2020 | 2097 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-01-18 | No Incident Encountered | 0.00 | 0.00 |
2017-02-04 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]