X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564211610000

Well Details

Well ID: 0564211610000
Loading map...
Location: 00/10-16-056-21W4/0
Location Alias: 00/10-16-56-21 W4M
Location Alias 2: 00/10-16-056-21 W4/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 21
Section: 16
County/Municipality: Strathcona County
Well Name: ACCEL HOLDINGS REDWATER 10-16-56-21
Operator Name: ACCEL Canada Holdings Limited
License Number: 0002390
License Date: 1950-12-01
License Status: Suspension
Spud Date: 1950-12-01
Final Drill Date: 1950-12-16
Well Total Depth: 997.90 m
Surface Hole Latitude: 53.841751
Surface Hole Longitude: -113.059310

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-12-01 Obtained License
1950-12-13 Liner Casing Operation Performed
1950-12-16 Drill Stem Test Performed
1950-12-16 Finished Drilling
1950-12-16 Perforation Treatment Performed - Acid Wash - No Pressure
1950-12-16 Perforation Treatment Performed - Open-Hole Completion
1950-12-16 Well Mode changed to Drilled and Cased
1950-12-24 Well Began Production
1950-12-24 Well Fluid changed to Crude Oil
1950-12-24 Well Mode changed to Flowing
1951-03-23 Well Fluid changed to Crude Oil
1951-03-23 Well Mode changed to Pumping
1956-10-17 Perforation Treatment Performed - Open-Hole Completion
1956-10-17 Perforation Treatment Performed - Resin-Gypsum Squeeze Or Plug
1957-06-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-08-24 Perforation Treatment Performed - Open-Hole Completion
1960-02-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-09-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-12-03 Perforation Treatment Performed - Fractured
1964-06-05 Perforation Treatment Performed - Cement Squeeze
1964-06-08 Perforation Treatment Performed - Bullet Perforation
1964-06-08 Perforation Treatment Performed - Fractured
1964-11-10 Perforation Treatment Performed - Cement Squeeze
1964-11-12 Perforation Treatment Performed - Bullet Perforation
1964-11-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-06-01 Well Fluid changed to Crude Oil
1968-06-01 Well Mode changed to Suspended
1992-11-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-12-21 Well Fluid changed to Crude Oil
1992-12-21 Well Mode changed to Pumping
1993-03-22 Well Log Performed
1993-05-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-05-11 Plug Back Performed
1993-05-11 Well Fluid changed to Crude Oil
1993-05-11 Well Log Performed
1993-05-11 Well Mode changed to Abandoned Zone
1993-05-12 Perforation Treatment Performed - Jet Perforation
1993-05-12 Well Log Performed
1993-07-15 Perforation Treatment Performed - Cement Squeeze
1993-07-15 Plug Back Performed
1993-07-22 Perforation Treatment Performed - Jet Perforation
1993-08-01 Well Fluid changed to Crude Oil
1993-08-01 Well Mode changed to Flowing
2002-08-19 Well Fluid changed to Crude Oil
2002-08-19 Well Mode changed to Pumping
2009-11-01 Well Fluid changed to Crude Oil
2009-11-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-12-16 Open Hole/Barefoot Completion 981.50 997.90 0
1963-12-03 Fracture 981.50 995.20 0
1964-06-05 Cement Squeeze 981.50 997.90 0
1964-06-08 Bullet Perforation 984.80 986.60 7
1964-06-08 Fracture 984.80 986.60 0
1964-11-10 Cement Squeeze 984.80 986.60 0
1964-11-12 Bullet Perforation 984.80 986.60 0
1964-11-13 Acid Treatment 984.80 986.60 0
1992-11-23 Acid Treatment 984.80 986.60 0
1993-05-11 Packing Device Capped w/Cement 969.00 975.00 0
1993-05-12 Perforation 952.80 954.90 13
1950-12-16 Acid Wash 981.50 997.90 0
1993-07-15 Cement Squeeze 952.80 954.90 0
1993-07-22 Perforation 984.80 986.60 13
1956-10-17 Resin-Gypsum Squeeze or Plug 990.60 997.90 0
1956-10-17 Open Hole/Barefoot Completion 981.50 990.60 0
1957-06-19 Acid Treatment 981.50 990.60 0
1959-08-24 Open Hole/Barefoot Completion 981.50 995.20 0
1960-02-03 Acid Treatment 989.10 989.70 0
1960-02-03 Acid Treatment 986.00 991.50 0
1961-09-22 Acid Treatment 981.50 995.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7769 0.0 0.0 0.0
1968 2878 0.0 0.0 0.0
1992 96 0.0 0.0 0.0
1993 4442 0.0 0.0 0.0
1994 8081 0.0 0.0 0.0
1995 8485 0.0 0.0 0.0
1996 8571 0.0 0.0 0.0
1997 8540 0.0 0.0 0.0
1998 8547 0.0 0.0 0.0
1999 8432 0.0 0.0 0.0
2000 8755 0.0 0.0 0.0
2001 8674 0.0 0.0 0.0
2002 8215 0.0 0.0 0.0
2003 8712 0.0 0.0 0.0
2004 8728 0.0 0.0 0.0
2005 8264 0.0 0.0 0.0
2006 8449 0.0 0.0 0.0
2007 1128 0.0 0.0 0.0

For data sources see[5]

References