If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0564212101000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.848986,"lon":-113.053189,"icon":""}]} |
Location: 00/01-21-056-21W4/0 | |
Location Alias: 00/01-21-56-21 W4M | |
Location Alias 2: 00/01-21-056-21 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 056 | |
Meridian: 4 | |
Range: 21 | |
Section: 21 | |
County/Municipality: Strathcona County | |
Well Name: IMPERIAL SIMMONS NO. 96 WELL | |
Operator Name: Imperial Oil Resources Limited | |
License Number: 0002457 | |
License Date: 1950-12-21 | |
License Status: RecCertified | |
Spud Date: 1950-12-18 | |
Final Drill Date: 1951-01-02 | |
Well Total Depth: 997.90 m | |
Surface Hole Latitude: 53.848986 | |
Surface Hole Longitude: -113.053189 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1950-12-21 | Obtained License |
1950-12-30 | Production Casing Operation Performed |
1951-01-02 | Finished Drilling |
1951-01-02 | Perforation Treatment Performed - Acid Wash - No Pressure |
1951-01-02 | Perforation Treatment Performed - Open-Hole Completion |
1951-01-02 | Well Mode changed to Drilled and Cased |
1951-01-03 | Well Began Production |
1951-01-03 | Well Fluid changed to Crude Oil |
1951-01-03 | Well Mode changed to Flowing |
1951-04-11 | Well Fluid changed to Crude Oil |
1951-04-11 | Well Mode changed to Pumping |
1956-10-02 | Perforation Treatment Performed - Open-Hole Completion |
1956-10-02 | Perforation Treatment Performed - Resin-Gypsum Squeeze Or Plug |
1957-07-18 | Perforation Treatment Performed - Open-Hole Completion |
1973-05-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1973-05-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1973-05-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1974-05-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1975-12-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1976-07-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1979-02-20 | Well Fluid changed to Crude Oil |
1979-02-20 | Well Mode changed to Suspended |
1992-09-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1992-09-28 | Perforation Treatment Performed - Jet Perforation |
1992-09-28 | Plug Back Performed |
1992-10-02 | Perforation Treatment Performed - Remedial Casing |
1992-10-02 | Well Fluid changed to Crude Oil |
1992-10-02 | Well Mode changed to Abandoned |
1992-10-19 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1951-01-02 | Open Hole/Barefoot Completion | 982.70 | 997.90 | 0 |
1975-12-09 | Acid Treatment | 982.70 | 997.90 | 0 |
1976-07-27 | Acid Treatment | 982.70 | 997.90 | 0 |
1992-09-28 | Packing Device Capped w/Cement | 940.00 | 948.00 | 0 |
1992-09-28 | Perforation | 195.50 | 196.50 | 7 |
1992-10-02 | Remedial Casing Cementing | 195.50 | 196.50 | 0 |
1951-01-02 | Acid Wash | 982.70 | 997.90 | 0 |
1956-10-02 | Resin-Gypsum Squeeze or Plug | 993.30 | 997.90 | 0 |
1956-10-02 | Open Hole/Barefoot Completion | 982.70 | 993.30 | 0 |
1957-07-18 | Open Hole/Barefoot Completion | 982.70 | 996.70 | 0 |
1973-05-15 | Acid Treatment | 982.70 | 994.90 | 0 |
1973-05-30 | Packing Device Capped w/Cement | 997.30 | 997.30 | 0 |
1973-05-30 | Acid Treatment | 982.70 | 995.50 | 0 |
1974-05-23 | Acid Treatment | 982.70 | 995.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 6776 | 0.0 | 0.0 | 0.0 |
1968 | 8277 | 0.0 | 0.0 | 0.0 |
1969 | 8692 | 0.0 | 0.0 | 0.0 |
1970 | 8724 | 0.0 | 0.0 | 0.0 |
1971 | 8513 | 0.0 | 0.0 | 0.0 |
1972 | 8622 | 0.0 | 0.0 | 0.0 |
1973 | 7477 | 0.0 | 0.0 | 0.0 |
1974 | 7843 | 0.0 | 0.0 | 0.0 |
1975 | 8241 | 0.0 | 0.0 | 0.0 |
1976 | 7412 | 0.0 | 0.0 | 0.0 |
1977 | 8222 | 0.0 | 0.0 | 0.0 |
1978 | 7092 | 0.0 | 0.0 | 0.0 |
1979 | 1007 | 0.0 | 0.0 | 0.0 |
For data sources see[5]