If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0564212607020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.87418,"lon":-113.00386,"icon":""}]} |
Location: 02/07-26-056-21W4/0 | |
Location Alias: 02/07-26-56-21 W4M | |
Location Alias 2: 02/07-26-056-21 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 056 | |
Meridian: 4 | |
Range: 21 | |
Section: 26 | |
County/Municipality: Strathcona County | |
Well Name: ACCEL HOLDINGS REDWATER 7-26-56-21 | |
Operator Name: ACCEL Canada Holdings Limited | |
License Number: 0414157 | |
License Date: 2009-11-18 | |
License Status: Issued | |
Spud Date: 2009-11-27 | |
Final Drill Date: 2009-12-03 | |
Well Total Depth: 1520.00 m | |
Surface Hole Latitude: 53.874180 | |
Surface Hole Longitude: -113.003860 |
Date | Event |
---|---|
2009-11-18 | Obtained License |
2009-11-28 | Surface Casing Operation Performed |
2009-11-29 | Direction Drilling Operation Performed - Horizontal |
2009-12-01 | Intermediate Casing Operation Performed |
2009-12-01 | Well Log Performed |
2009-12-03 | Finished Drilling |
2009-12-03 | Well Log Performed |
2009-12-03 | Well Mode changed to Drilled and Cased |
2009-12-04 | Rig Released |
2009-12-29 | Well Log Performed |
2010-01-10 | Perforation Treatment Performed - Open-Hole Completion |
2010-01-18 | Well Began Production |
2010-01-18 | Well Fluid changed to Crude Oil |
2010-01-18 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2009-11-29 | 530.10 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-01-10 | Open Hole/Barefoot Completion | 1021.00 | 1520.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 7526 | 0.0 | 0.0 | 0.0 |
2011 | 8446 | 0.0 | 0.0 | 0.0 |
2012 | 8708 | 0.0 | 0.0 | 0.0 |
2013 | 7758 | 0.0 | 0.0 | 0.0 |
2014 | 8719 | 0.0 | 0.0 | 0.0 |
2015 | 7907 | 0.0 | 0.0 | 0.0 |
2016 | 5324 | 0.0 | 0.0 | 0.0 |
2018 | 3244 | 0.0 | 0.0 | 0.0 |
2019 | 2268 | 0.0 | 0.0 | 0.0 |
For data sources see[6]