If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0565081716000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.844265,"lon":-115.145487,"icon":""}]} |
Location: 00/16-17-056-08W5/0 | |
Location Alias: 00/16-17-56-08 W5M | |
Location Alias 2: 00/16-17-056-08 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 056 | |
Meridian: 5 | |
Range: 08 | |
Section: 17 | |
County/Municipality: Lac Ste. Anne County | |
Well Name: FMEL PADDLER 16-17-56-8 | |
Operator Name: Point Loma Resources Ltd. | |
License Number: 0011667 | |
License Date: 1956-06-20 | |
License Status: Suspension | |
Spud Date: 1956-07-17 | |
Final Drill Date: 1956-08-13 | |
Well Total Depth: 1645.90 m | |
Surface Hole Latitude: 53.844265 | |
Surface Hole Longitude: -115.145487 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1956-06-20 | Obtained License |
1956-07-27 | Drill Stem Test Performed |
1956-07-28 | Drill Stem Test Performed |
1956-08-04 | Drill Stem Test Performed |
1956-08-05 | Drill Stem Test Performed |
1956-08-06 | Drill Stem Test Performed |
1956-08-13 | Finished Drilling |
1956-08-13 | Well Mode changed to Drilled and Cased |
1956-08-15 | Production Casing Operation Performed |
1956-08-15 | Well Log Performed |
1956-08-18 | Perforation Treatment Performed - Acid Wash - No Pressure |
1956-08-18 | Perforation Treatment Performed - Bullet Perforation |
1956-08-21 | Perforation Treatment Performed - Acid Wash - No Pressure |
1956-08-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1956-08-21 | Perforation Treatment Performed - Bullet Perforation |
1956-08-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1956-08-23 | Perforation Treatment Performed - Bullet Perforation |
1956-08-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1956-08-27 | Perforation Treatment Performed - Cement Squeeze |
1956-08-28 | Perforation Treatment Performed - Acid Wash - No Pressure |
1956-08-28 | Perforation Treatment Performed - Bullet Perforation |
1956-08-31 | Perforation Treatment Performed - Cement Squeeze |
1956-09-01 | Perforation Treatment Performed - Acid Wash - No Pressure |
1956-09-01 | Perforation Treatment Performed - Bullet Perforation |
1956-09-25 | Well Began Production |
1956-09-25 | Well Fluid changed to Crude Oil |
1956-09-25 | Well Mode changed to Flowing |
1957-01-27 | Perforation Treatment Performed - Cement Squeeze |
1957-01-27 | Perforation Treatment Performed - Jet Perforation |
1957-01-29 | Perforation Treatment Performed - Jet Perforation |
1957-01-31 | Perforation Treatment Performed - Cement Squeeze |
1957-02-06 | Perforation Treatment Performed - Acid Wash - No Pressure |
1957-02-08 | Perforation Treatment Performed - Acid Wash - No Pressure |
1957-02-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1957-02-12 | Perforation Treatment Performed - Cement Squeeze |
1957-02-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1957-02-13 | Perforation Treatment Performed - Jet Perforation |
1957-02-14 | Perforation Treatment Performed - Acid Wash - No Pressure |
1957-11-13 | Well Fluid changed to Crude Oil |
1957-11-13 | Well Mode changed to Suspended |
1958-01-29 | Drill Stem Test Performed |
1977-10-08 | Perforation Treatment Performed - Cement Squeeze |
1989-10-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1989-10-28 | Plug Back Performed |
1989-10-28 | Well Fluid changed to Crude Oil |
1989-10-28 | Well Mode changed to Abandoned and Whipstocked |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1956-08-18 | Bullet Perforation | 1625.20 | 1628.50 | 0 |
1956-08-28 | Bullet Perforation | 1588.60 | 1592.90 | 13 |
1956-08-28 | Acid Wash | 1588.60 | 1592.90 | 0 |
1956-08-31 | Cement Squeeze | 1588.60 | 1592.90 | 0 |
1956-09-01 | Bullet Perforation | 1583.70 | 1588.00 | 13 |
1956-09-01 | Acid Wash | 1583.70 | 1588.00 | 0 |
1957-01-27 | Perforation | 1573.40 | 1573.70 | 13 |
1957-01-27 | Cement Squeeze | 1573.40 | 1573.70 | 0 |
1957-01-29 | Perforation | 1562.70 | 1563.00 | 13 |
1957-01-31 | Cement Squeeze | 1562.70 | 1563.00 | 0 |
1957-02-06 | Acid Wash | 1583.70 | 1587.40 | 0 |
1956-08-18 | Acid Wash | 1625.20 | 1628.50 | 0 |
1957-02-08 | Acid Wash | 1583.70 | 1587.40 | 0 |
1957-02-11 | Packing Device Capped w/Cement | 1580.40 | 1580.40 | 0 |
1957-02-12 | Cement Squeeze | 1573.40 | 1573.70 | 0 |
1957-02-13 | Packing Device Capped w/Cement | 1570.30 | 1570.30 | 0 |
1957-02-13 | Perforation | 1566.70 | 1569.70 | 13 |
1957-02-14 | Acid Wash | 1566.70 | 1569.70 | 0 |
1977-10-08 | Cement Squeeze | 1566.70 | 1569.70 | 0 |
1989-10-28 | Packing Device Capped w/Cement | 1300.00 | 1410.00 | 0 |
1956-08-21 | Packing Device Capped w/Cement | 1624.00 | 1624.00 | 0 |
1956-08-21 | Bullet Perforation | 1618.50 | 1622.80 | 0 |
1956-08-21 | Acid Wash | 1618.50 | 1622.80 | 0 |
1956-08-23 | Packing Device Capped w/Cement | 1614.20 | 1614.20 | 0 |
1956-08-23 | Bullet Perforation | 1597.20 | 1600.20 | 0 |
1956-08-24 | Packing Device Capped w/Cement | 1612.40 | 1612.40 | 0 |
1956-08-27 | Cement Squeeze | 1597.20 | 1600.20 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1977 | 18 | 0.0 | 0.0 | 0.0 |
For data sources see[5]